Regarding the ordinary maintenance work on the channels, details are
given in Appendices B and C. Appendix D, reprinted from _Punjab Rivers
and Works_, contains rules for watching and protecting any banks or
embankments which require it.
Silt clearances and berm cutting of channels have been mentioned in Art.
1. Special attention should be given to the accurate ranging of the
centre line. Otherwise the channel may become crooked. The great defect
in the earthwork ordinarily met with in the banks of canals and
distributaries is that the clods are not broken. In consequence of this
new banks are extremely liable to breach, and much trouble and expense
result. Sometimes a dam is thrown across a new distributary, and the
channel upstream of it is gradually filled with water, the bank being
watched and leakages made good. The dam is then shifted to a place
further down. In this way the banks are consolidated.
When a distributary is closed for silt clearance or other work, if the
head regulator has planks and a double set of grooves, it is possible to
stop all leakage by filling in earth between the two sets of planks and
ramming it, but otherwise it is necessary to construct an earthen dam
just below the regulator. Upstream of the dam the water, owing to the
leakage through the planks, gates or needles, rises to the same level as
the water in the canal. Native subordinates have a remarkable aptitude
for allowing such dams to break while the work in the distributary is in
progress or before it is measured. Now and then the dam is wilfully cut.
The remedy is to make the dam of proper strength--the top should be 8
feet wide and a foot above the water,--and to have it watched day and
night.
At a bend in a channel there is often a silt bank next the convex bank,
and a hollow near the concave bank. The average bed level is probably
very much the same as in the straight reaches. Removal of the silt bank
is unnecessary, and if removed it quickly forms again.
Any length of channel in which the depth of silt to be cleared is small,
say ·50 foot in a large channel and ·40 foot in a small one, should not
be cleared, provided its length is considerable (say 1,000 feet), and
that it is not close to (say within 3,000 or 2,000 feet from) the head
of the channel. Estimates should be prepared accordingly, the shallow
digging being struck out. Clearing a small depth of silt merely gives
contractors a chance of cheating by scraping the bed.
If the watercourses at the tail of a distributary are silted, the people
should be pressed to clear them. Otherwise there will be heading up of
the water of the distributary, and silt deposit may result.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account