The press, Chile mill, and motor need no special mention, as they all
are from standard patterns and bought, without alterations, from the
respective builders. The Chile mill was purchased from the builders
of the brick press. The conveyor-elevator was built on the premises
and consists of a 14 in. eight-ply rubber belt, with buckets of sheet
steel placed at intervals of 6 in., running over flanged pulleys. The
buckets, or more properly speaking the flights, are made from No.
12 steel plate, flanged to produce the back and ends, with the ends
secured to the flanged bottom by one rivet in each. The plant has been
in operation for sixteen months and there have been few or no repairs
to the elevator, except to renew the belt, which is attacked by the
acid contained in the charges. This first belt was in continuous use
for nine months. As originally designed, the capacity was 100 tons per
day of 12 hours, but this was found to require a speed so high that
the workmen were unable to handle the output of the press. The speed
was, consequently, reduced about 25 per cent., which brings the output
down to about 75 tons per day. This output, as expressed in weight,
naturally varies somewhat owing to the variation in the weight of the
material handled.
It is probable that the capacity could be increased to about 90 tons
by enlarging the bricks, which could be done, but would require a
considerable amount of alteration in the machine, as it is designed to
produce a standard sized building brick. By this method of increase,
however, the work of handling would not be materially increased,
because the number of bricks would be the same as with the present
output of 75 tons; there would be about 16 per cent. more to handle,
by weight. Working on the basis of 100 tons capacity, the bins were
designed to afford storage room for about three days’ run, or a little
over 300 tons. The bins are made entirely of steel, in order that
the hot material may be dumped into them directly from the roasting
furnaces, thus saving one handling. In order that there may be room
for several kinds of material, the bins are divided into seven
compartments, three on one side and four on the other. The lower part
is of ⅜ in. steel plate, and the upper, about one-half the hight, of
5/16 in. plate.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account