Lead Smelting and Refining, With Some Notes on Lead Mining
Science
Lead Smelting and Refining, With Some Notes on Lead Mining
Lead -- Metallurgy; Lead mines and mining
───────────┬────────┬───────┬─────────────────────┬─────────────────────
│ │ │ HAND ROASTERS │ BROWN-O’HARRA
│ │ │ │ MECHANICAL FURNACES
│ TOTAL │ TONS ├──────┬──────┬───────┼──────┬──────┬───────
Month │ TONS │ROASTED│LABOR │ COAL │GENERAL│LABOR │COAL │GENERAL
│ROASTED │PER DAY│ $ │ $ │EXPENSE│ $ │ $ │EXPENSE
│ │ │ │ │ $ │ │ │ $
───────────┼────────┼───────┼──────┼──────┼───────┼──────┼──────┼───────
January │ 5,691 │ 184 │ 1.47 │ 0.53 │ 0.80 │ 0.92 │ 0.80 │ 1.32
February │ 5,677 │ 203 │ 1.44 │ 0.44 │ 0.99 │ 0.72 │ 0.58 │ 1.01
March │ 5,821 │ 188 │ 1.51 │ 0.53 │ 0.64 │ 0.76 │ 0.64 │ 0.62
April │ 5,472 │ 182 │ 1.47 │ 0.47 │ 0.71 │ 0.80 │ 0.69 │ 0.87
May │ 5,444 │ 176 │ 1.55 │ 0.51 │ 0.84 │ 0.80 │ 0.69 │ 0.81
June │ 4,859 │ 162 │ 1.58 │ 0.48 │ 0.71 │ 0.90 │ 0.68 │ 1.17
July │ 5,691 │ 184 │ 1.59 │ 0.48 │ 0.75 │ 0.72 │ 0.56 │ 0.64
August │ 5,910 │ 191 │ 1.55 │ 0.46 │ 0.83 │ 0.72 │ 0.55 │ 0.75
September │ 5,677 │ 189 │ 1.55 │ 0.45 │ 0.74 │ 0.73 │ 0.55 │ 0.67
October │ 6,254 │ 202 │ 1.48 │ 0.49 │ 0.72 │ 0.65 │ 0.50 │ 0.60
November │ 6,291 │ 213 │ 1.42 │ 0.47 │ 0.80 │ 0.66 │ 0.53 │ 0.70
December │ 5,874 │ 198 │ 1.45 │ 0.48 │ 0.78 │ 0.79 │ 0.63 │ 0.81
├────────┼───────┼──────┼──────┼───────┼──────┼──────┼───────
Average │ │ │ 1.50 │ 0.48 │ 0.77 │ 0.76 │ 0.62 │ 0.83
Total │ │ │ │ │ 2.75 │ │ │ 2.21
───────────┴────────┴───────┴──────┴──────┴───────┴──────┴──────┴───────
_Cost of Smelting._—The lead-ore mixtures of the United States, in
addition to lead, contain gold, silver and generally copper, and are
treated to save these metals. The total cost of smelting is made up of
a large number of items. The questions of locality and transportation,
fuel, fluxes and labor are the principal factors, to which must be
added the handling of the material to and from the furnace; the
furnace itself, its size, shape, and method of smelting, the volume
and pressure of blast, etc. The following table of costs, from 1887 to
1898, shows in a general way the great advance that has been made in
the development of smelting, and the consequent reduction in cost per
ton of ore treated:
AVERAGE COST OF SMELTING, PER TON
1887 $4.644
1888 4.530
1889 4.480
1890 4.374
1891 4.170
1892 4.906
1893 3.375
1894 3.029
1895 2.786
1896 2.750
1897 2.520
1898 2.260
In connection with this table of smelting cost should be considered the
changes developed during the interval 1887-1889, outlined as follows:
CONDITIONS OF SMELTING IN 1886 AND 1899 CONTRASTED TO SHOW THE PROGRESS
OF DEVELOPMENT
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account