Light Science for Leisure Hours: A series of familiar essays on scientific subjects, natural phenomena, &c.Proctor, Richard A. (Richard Anthony)
Science
Light Science for Leisure Hours: A series of familiar essays on scientific subjects, natural phenomena, &c.
Proctor, Richard A. (Richard Anthony)
Science
The Mont Cenis tunnel was sanctioned by the Sardinian Government in
1857, and arrangements were made for fixing the perforating machinery
in the years 1858 and 1859. But the work was not actually commenced
until November 1860. The tunnel—which will be fully seven and a half
miles in length—was to be completed in twenty-five years. The entrance
to the tunnel on the side of France is near the little village of
Fourneau, and lies 3,946 feet above the level of the sea. The entrance
on the side of Italy is in a deep-valley at Bardonèche, and lies 4,380
feet above the sea level. Thus there is a difference of level of 434
feet. But the tunnel will actually rise 445 feet above the level of the
French end, attaining this height at a distance of about four miles
from that extremity; in the remaining three and three-quarter miles
there will be a fall of only ten feet, so that this part of the line
will be practically level.
The rocks through which the excavations have been made have been for
the most part very difficult to work. Those who imagine that the
great mass of our mountain ranges consists of such granite as is made
use of in our buildings, and is uniform in texture and hardness,
greatly underrate the difficulties with which the engineers of this
gigantic work have had to contend. A large part of the rock consists
of a crystallised calcareous schist, much broken and contorted;
and through this rock run in every direction large masses of pure
quartz. It will be conceived how difficult the work has been of
piercing through so diversified a substance as this. The perforating
machines are calculated to work best when the resistance is uniform;
and it has often happened that the unequal resistance offered to the
perforators has resulted in injury to the chisels. But before the work
of perforating began, enormous difficulties had to be contended with.
It will be understood that, in a tunnel of such vast length, it was
absolutely necessary that the perforating processes carried on from
the two ends should be directed with the most perfect accuracy. It has
often happened in short tunnels that a want of perfect coincidence has
existed between the two halves of the work, and the tunnellers from one
end have sometimes altogether failed to meet those from the other. In
a short tunnel this want of coincidence is not very important, because
the two interior ends of the tunnellings cannot in any case be far
removed from each other. But in the case of the Mont Cenis tunnel any
inaccuracy in the direction of the two tunnellings would have been
fatal to the success of the work, since when the two ought to meet
it might be found that they were laterally separated by two or three
hundred yards. Hence it was necessary before the work began to survey
the intermediate country, so as to ascertain with the most perfect
accuracy the bearings of one end of the tunnel from the other. ‘It was
necessary,’ says the narrative of these initial labours, ‘to prepare
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account