Lighthouses and Lightships: A Descriptive and Historical Account of Their Mode of Construction and Organization — John Shaqi
Lighthouses and Lightships: A Descriptive and Historical Account of Their Mode of Construction and OrganizationAdams, W. H. Davenport (William Henry Davenport)
History
Lighthouses and Lightships: A Descriptive and Historical Account of Their Mode of Construction and Organization
Adams, W. H. Davenport (William Henry Davenport)
Lighthouses; Lightships
“The stone to be set being hung in the tackle, and its bed of mortar
spread, was then lowered into its place, and beaten with a heavy wooden
mall, and levelled with a spirit-level; and the stone being accurately
brought to its marks, it was then considered as set in its place. The
business now was to retain it exactly in that position, notwithstanding
the utmost violence of the sea might come upon it before the mortar
was hard enough to resist it. The carpenter now dropped into each
groove two of the oaken wedges, one upon its head, the other with its
point downwards, so that the two wedges in each groove would lie heads
and points. With a bar of iron about two inches and a half broad, a
quarter of an inch thick, and two feet and a half long, the ends being
square, he could easily (as with a rammer) drive down one wedge upon
the other; very gently at first, so that the opposite pairs of wedges,
being equally tightened, they would equally resist each other, and the
stone would therefore keep place. A couple of wedges were also, in like
manner, pitched at the top of each groove; the dormant wedge, or that
with the point upward, being held in the hand, while the drift-wedge,
or that with its point downward, was driven with a hammer. The whole
of what remained above the upper surface of the stone was then cut off
with a saw or chisel; and, generally, a couple of thin wedges were
driven very moderately at the butt-end of the stone; whose tendency
being to force it out of its dove-tail, they would, by moderate
driving, only tend to preserve the whole mass steady together, in
opposition to the violent agitation that might arise from the sea.”
When the stone was firmly secured, the next step was to liquefy a
certain portion of mortar; and the joints having been carefully
pointed, up to the upper surface, this mortar or cement was poured in
with iron ladles so as to occupy every empty space. The more consistent
parts of the cement naturally fell to the bottom, and the watery were
absorbed by the stone; the vacancy thus left at the top was repeatedly
refilled, until all remained solid; then the top was pointed, and,
where necessary, defended by a layer of plaster.
The whole of the foundation having thus been elevated to a proper
level, some other means was required to obtain a similar amount of
security for the substructure.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account