When forming the road, the proper gauge had also to be determined. What
width was this to be? The gauge of the first tramroad laid down had
virtually settled the point. The gauge of wheels of the common vehicles
of the country—of the carts and waggons employed on common roads, which
were first used on the tramroads—was about 4 feet 8½ inches. And so the
first tramroads were laid down of this gauge. The tools and machinery
for constructing coal-waggons and locomotives were formed with this gauge
in view. The Wylam waggon-way, afterwards the Wylam plate-way, the
Killingworth railroad, and the Hetton rail road, were as nearly as
possible on the same gauge. Some of the earth-waggons used to form the
Stockton and Darlington road were brought from the Hetton railway; and
others which were specially constructed were formed of the same
dimensions, these being intended to be afterwards employed in the working
of the traffic.
As the period drew near for the opening of the line, the question of the
tractive power to be employed was anxiously discussed. At the Brusselton
incline, fixed engines must necessarily be made use of; but with respect
to the mode of working the railway generally, it was decided that horses
were to be largely employed, and arrangements were made for their
purchase. The influence of Mr. Pease also secured that a fair trial
should be given to the experiment of working the traffic by locomotive
power; and three engines were ordered from the firm of Stephenson and
Co., Newcastle, which were put in hand forthwith, in anticipation of the
opening of the railway. These were constructed after Mr. Stephenson’s
most matured designs, and embodied all the improvements which he had
contrived up to that time. No. I. engine, the “Locomotion,” which was
first delivered, weighed about eight tons. It had one large flue or tube
through the boiler, by which the heated air passed direct from the
furnace at one end, lined with fire-bricks, to the chimney at the other.
The combustion in the furnace was quickened by the adoption of the
steam-blast in the chimney. The heat raised was sometimes so great, and
it was so imperfectly abstracted by the surrounding water, that the
chimney became almost red-hot. Such engines, when put to their speed,
were found capable of running at the rate of from twelve to sixteen miles
an hour; but they were better adapted for the heavy work of hauling
coal-trains at low speeds—for which, indeed, they were specially
constructed—than for running at the higher speeds afterwards adopted.
Nor was it contemplated by the directors as possible, at the time when
they were ordered, that locomotives could be made available for the
purposes of passenger travelling. Besides, the Stockton and Darlington
Railway did not run through a district in which passengers were supposed
to be likely to constitute any considerable portion of the traffic.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account