The length of railway to be constructed between London and Birmingham was
112½ miles. The line crossed a series of low-lying districts separated
from each other by considerable ridges of hills; and it was the object of
the engineer to cross the valleys at as high, and the hills at as low,
elevations as possible. The high ground was therefore cut down and the
“stuff” led into embankments, in some places of great height and extent,
so as to form a road upon as level a plane as was considered practicable
for the working of the locomotive engine. In some places, the high
grounds were passed in open cuttings, whilst in others it was necessary
to bore through them in tunnels with deep cuttings at each end.
The most formidable excavations on the line are those at Tring, Denbigh
Hall, and Blisworth. The Tring cutting is an immense chasm across the
great chalk ridge of Ivinghoe. It is 2½ miles long, and for ¼ of a mile
is 57 feet deep. A million and a half cubic yards of chalk and earth
were taken out of this cutting by means of horse-runs and deposited in
spoil banks; besides the immense quantity run into the embankment north
of the cutting, forming a solid mound nearly 6 miles long and about 30
feet high. Passing over the Denbigh Hall cutting, and the Wolverton
embankment of 1½ mile in length across the valley of the Ouse, we come to
the excavation at Blisworth, a brief description of which will give the
reader an idea of one of the most difficult kinds of railway work.
[Picture: Blisworth Cutting]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account