The breadth of the river at the point of crossing is 515 feet, but the
length of the bridge and viaduct between the Gateshead station and the
terminus on the Newcastle side is about 4000 feet. It springs from
Pipewell Gate Bank, on the south, directly across to Castle Garth, where,
nearly fronting the bridge, stands the fine old Norman keep of the _New_
Castle, now nearly 800 years old, and a little beyond it is the spire of
St. Nicholas Church, with its light and graceful Gothic crown; the whole
forming a grand architectural group of unusual historic interest. The
bridge passes completely over the roofs of the houses which fill both
sides of the valley; and the extraordinary height of the upper parapet,
which is about 130 feet above the bed of the river, offers a prospect to
the passing traveller the like of which is perhaps nowhere else to be
seen. Far below are the queer chares and closes, the wynds and lanes of
old Newcastle; the water is crowded with pudgy, black, coal keels; and,
when there is a partial dispersion of the great smoke clouds which
usually obscure the sky, the funnels of steamers and the masts of
shipping may be seen far down the river. The old bridge lies so far
beneath that the passengers crossing it seem like so many bees passing to
and fro.
The first difficulty encountered in building the bridge was in securing a
solid foundation for the piers. The dimensions of the piles to be driven
were so huge, that the engineer found it necessary to employ some
extraordinary means for the purpose. He called Nasmyth’s Titanic
steam-hammer to his aid—the first occasion, we believe, on which this
prodigious power was employed in bridge pile-driving. A temporary
staging was erected for the steam-engine and hammer apparatus, which
rested on two keels, and, notwithstanding the newness and stiffness of
the machinery, the first pile was driven on the 6th October, 1846, to a
depth of 32 feet, in four minutes. Two hammers of 30 cwt. each were kept
in regular use, making from 60 to 70 strokes a minute; and the results
were astounding to those who had been accustomed to the old style of
pile-driving by means of the ordinary pile-frame, consisting of slide,
ram, and monkey. By the old system, the pile was driven by a
comparatively small mass of iron descending with great velocity from a
considerable height—the velocity being in excess and the mass deficient,
and calculated, like the momentum of a cannon-ball, rather for
destructive than impulsive action. In the case of the steam pile-driver,
on the contrary, the whole weight of a heavy mass is delivered rapidly
upon a driving-block of several tons weight placed directly over the head
of the pile, the weight never ceasing, and the blows being repeated at
the rate of a blow a second, until the pile is driven home. It is a
curious fact, that the rapid strokes of the steam-hammer evolved so much
heat, that on many occasions the pile-head burst into flames during the
process of driving.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account