About midway between Conway and Bangor, Penmaen Mawr forms a bold and
almost precipitous headland, at the base of which, in rough weather, the
ocean dashes with great fury. There was not space enough between the
mountain and the strand for the passage of the railway; hence in some
places the rock had to be blasted to form a terrace, and in others
sea-walls had to be built up to the proper level, on which to form an
embankment of sufficient width to enable the road to be laid. [Picture:
Penmaen Mawr. (By Percival Skelton.)] A tunnel 10½ chains in length was
cut through the headland itself; and on its east and west sides the line
was formed by a terrace cut out of the cliff, and by embankments
protected by sea walls; the terrace being three times interrupted by
embankments in its course of about 1¼ mile. The road lies so close under
the steep mountain face, that it was even found necessary at certain
places to protect it against possible accidents from falling stones, by
means of a covered way. The terrace on the east side of the headland
was, however, in some measure protected against the roll of the sea by
the mass of stone run out from the tunnel, and forming a deep shingle
bank in front of the wall.
The part of the work which lies on the westward of the headland
penetrated by the tunnel, was exposed to the full force of the sea; and
the formation of the road at that point was attended with great
difficulty. While the sea wall was still in progress, its strength was
severely tried by a strong north-westerly gale, which blew in October,
1846, with a spring tide of 17 feet. On the following morning it was
found that a large portion of the rubble was irreparably injured, and 200
yards of the wall were then replaced by an open viaduct, with the piers
placed edgeways to the sea, the openings between them being spanned by
ten cast-iron girders each 42 feet long. This accident induced the
engineer to alter the contour of the sea wall, so that it should present
a diminished resistance to the force of the waves. But the sea repeated
its assaults, and made further havoc with the work; entailing heavy
expenses and a complete reorganisation of the contract. Increased
solidity was then given to the masonry, and the face of the wall
underwent further change. At some points outworks were constructed, and
piles were driven into the beach about 15 feet from the base of the wall,
for the purpose of protecting its foundations and breaking the force of
the waves. The work was at length finished after about three years’
anxious labour; but Mr. Stephenson confessed that if a long tunnel had
been made in the first instance through the solid rock of Penmaen Mawr, a
saving of from £25,000 to £30,000 would have been effected. He also said
he had arrived at the conclusion that in railway works engineers should
endeavour as far as possible to avoid the necessity of contending with
the sea; {324} but if he were ever again compelled to go within its
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account