Manual for submarine miningUnited States. War Department
History
Manual for submarine mining
United States. War Department
Submarine mines -- Handbooks, manuals, etc.
4. When 35 seconds have elapsed, turn the shunt to the ¹/₁₀₀₀-post and
watch the galvanometer throw; if small, move the shunt successively to
the ¹/₁₀₀-post, to the ¹/₁₀-post, and to the unity post. This operation
must be completed before 45 seconds have elapsed from the time the
key was closed. With good cable the unity post will always be reached
without danger of throwing the galvanometer reading off the scale.
Remember that each successive post should give 10 times the throw of
the preceding post.
5. At the end of one minute read the deflection, correct for the
leakage of the leads and the earth currents, and record. (See example
following.)
6. At the end of two minutes read the deflection, correct and record
it. For good cable it should be less than the deflection observed at
the end of one minute.
7. Turn the shunt to 0, and reverse the key, stopping at the discharge
position. Turn the shunt on gradually until the unity post is reached
and wait until the reading is 0, indicating that the conductor is
discharged. If earth currents are present, 0 will not be reached
or will be passed. In this case proceed as before described. A
submarine mine cable conductor a mile long will discharge ordinarily in
about three minutes.
8. Turn the shunt to 0, stop and start the stop watch; at the same time
close the key all the way down (- to earth).
9. After 35 seconds, start turning the shunt, ceasing at 45 seconds.
(See paragraph 4, above.)
10. At the end of one minute read the deflection, correct and record
it. For good cable it should be substantially the same as the
deflection observed at the end of one minute with + of the battery to
earth.
11. Turn the shunt to 0, and reverse the key, stopping at the discharge
position.
12. Disconnect No. 2 conductor from ground. Disconnect No. 1 from the
lead and connect up No. 2. Connect No. 1 to ground. It is not necessary
to wait for No. 1 to be discharged completely before disconnecting it.
13. Proceed with No. 2 as with No. 1 and repeat with each conductor.
14. On the completion of the test all conductor ends should be
carefully taped.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account