Manual for submarine mining
United States. War Department
Submarine mines -- Handbooks, manuals, etc.
1. To lay out the mine fields.
2. To lay the multiple cable.
3. To plant mines.
4. To take up mines (including replacing defective mines
by good ones where necessary).
5. To take up the cable.
The commanding officer of the vessel is responsible for the proper
equipment of the vessel with the necessary apparatus for mine planting,
for the loading of all the matériel prior to the planting, and for the
method of procedure under the above heads.
The master of the vessel will carry out the orders of the commanding
officer and is concerned only in the handling of his boat to prevent
accidents to it and to the boats engaged in the planting.
The following precautions will be observed by masters:
1. If current flows across the mine field the planting vessel, to avoid
accidents, should always pass on the downstream side of the yawl boat
holding the measuring line.
2. The greatest care should be taken that the measuring line and buoy
ropes are not caught in the propellers. If the vessel has twin screws,
the upstream propeller should be stopped as soon as the measuring line
has been passed to the marking boat. In all cases a man with a boat
hook should be posted near the anchor davits and another amidships, to
hold the measuring line above the water and clear of the sides of the
vessel. Keg buoys, and as much of the buoy rope as possible, should be
held on the rail near the stern, letting the rope pay out slowly and
under tension, until the propellers are past the rope, then the keg and
the remainder of the rope may be thrown overboard.
3. A general rule is never to back either propeller when buoy ropes,
measuring lines, or cables are being handled overboard at or near the
stern of the vessel.
4. If it becomes absolutely necessary to reverse the propellers when
paying out cable, men paying it out must haul it in taut and keep it
above the wheel and clear of it. The planting vessel should not pass
nearer than 25 feet to the distribution box boat when cable is leading
out from the latter, nor should it pass over any cable, if it can be
avoided, if the depth is less than 16 feet.
5. The vessel should proceed after passing the distribution box boat
on such a course that cable will pay off smoothly without becoming
entangled. If a cable becomes fouled and entangled, the end should
be “let go” at once at the distribution box boat—the planter should
proceed on, not stop nor back its propellers. Mine cable should
never be made fast in the distribution box boat until after a mine
is dropped. It is much better to drop the mine out of position than
to endanger the propellers of the vessel. The propeller nearest the
distribution box should be stopped the moment the bow of the vessel
passes the distribution box boat on its course to drop a mine.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account