Minerals in rock sections : $b The practical methods of identifying minerals in rock sections with the microscope, especially arranged for students in technical and scientific schoolsLuquer, Lea McIlvaine
Science
Minerals in rock sections : $b The practical methods of identifying minerals in rock sections with the microscope, especially arranged for students in technical and scientific schools
Luquer, Lea McIlvaine
Petrology -- Laboratory manuals
When the section is all ready for its final mounting it is carefully
centered with a coarse needle on the glass slide,[131] and a drop of the
thin solution placed at the edge of the section. Capillary attraction
will cause it to flow over the glass slide under the section, and while
it is soft the section can be again adjusted in place. The slide is then
placed in a cool, dust proof place and allowed to stand for about twelve
hours, when the cement will be set and the section held firmly in place.
The upper surface of the section is then washed with a drop of benzine,
and as much as may be necessary of the thick mounting solution placed
upon it with a glass rod. A cover of glass of the right size is gently
heated and placed in position over the section. Care must be taken not
to have the cover too hot, as it would cause bubbles to form in the
cement. It is also best to rest one edge of the cover on the cement
first, and then lower it gently so as to prevent air bubbles from being
included. The cover is adjusted and then held firmly in position by
means of a mounting clamp, which presses out all superfluous cement. If
a few small bubbles remain near the edges they may be let alone, as they
will generally work out by themselves in time. Sometimes a large bubble
can be worked out by local pressure with the finger and gentle heating
with a small iron rod. If the mounting is unsatisfactory the cover
should be removed by heating, the old cement washed off with a camel’s
hair brush and benzole, and a fresh cover put on. After the cement has
set, the clamp may be removed, but the slide should be left for 24
hours, or longer if necessary, until the cement is quite hard. This
takes longer in hot than in cold weather.
The advantage of using two solutions for mounting is that the section is
firmly held in place on the glass slide while the cover is being placed
over it; there is thus no slipping or sliding of the section, and when
the cover is adjusted in place the work is well finished and the section
still in the centre of the slide.
Canada balsam, or balsam in xylol, are also often used for mounting. The
advantage of the latter being its quick drying or “setting.”
Cleaning and Finishing.
When the cement has set the superfluous part is singed by means of a
small hot iron rod. Care must be taken not to use too large a rod or to
have it too hot, as the cement under the cover might then soften and
allow the cover to slip or air bubbles to form. The singeing drives off
the more volatile part of the cement, leaving only a brittle residue,
which can be easily scraped off with a knife. In some cases it may be
necessary to singe and scrape twice. The final cleaning is done with a
soft rag and benzole. The slides are now ready to be marked, either with
a diamond pencil or with pasted labels.
Convenient Apparatus for Work in a Petrographical Laboratory:
Section lifters made of watch springs, three sizes.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account