Narrative of a Survey of the Intertropical and Western Coasts of Australia — Vol. 1: Performed between the years 1818 and 1822King, Philip Parker
History
Narrative of a Survey of the Intertropical and Western Coasts of Australia — Vol. 1: Performed between the years 1818 and 1822
King, Philip Parker
Australia -- Description and travel; Natural history -- Australia
As it now appeared certain that some considerable time must elapse before
we could reload the cutter, she was secured at the next tide in a
situation nearer the high-water mark. At low water a deep hole was dug
under her bottom, to enable the carpenter to work with his auger; and
this operation was necessarily renewed every tide, since the hole was
always found filled up after the high water. An armourer's forge and
tools were now much wanted but the deficiency of an anvil was supplied by
the substitution of a pig of ballast; and some chain plates that we had
fortunately taken from the Frederick's wreck, and some bar-iron which was
brought out from England by the Dromedary, enabled us to place our vessel
in a state of security which we were by no means in before.
In order to connect the keel and stern-post, both of which were almost
separated from the frame of the vessel, two bolts, each twenty-four
inches long, were driven up obliquely through the keel and two of the
same size horizontally through the stern-post into the dead wood; besides
which they were also united by a stout iron brace which was fitted under
the keel and up each side of the stern-post; by which method the injury
appeared to be so well repaired that we had no fears for our safety if
the weather should be but moderately fine.
September 28.
These repairs were completed by the 28th but, just as we were
congratulating ourselves upon having performed them, a fresh defect was
discovered which threatened more alarming consequences even than the
other: upon stripping off some sheets of copper, the spike nails which
fastened the planks were found to be decaying; and many were so entirely
decomposed by oxidation that a straw was easily thrust through the vacant
holes. As we had not nails enough to replace the copper, for that was now
our only security, we could not venture to remove more than a few sheets
from those parts which appeared to be the most suspicious, under all of
which we found the nails so defective that we had reason to fear we might
start some planks before we reached Port Jackson, the consequence of
which would unquestionably be fatal to the vessel and our lives. All that
we could do to remedy the defect was to caulk the water-ways and counter,
and to nail an additional streak of copper a foot higher than before.
This further temporary repair was finished by the 30th.
1820. October 5.
But we were detained until the 5th of October before the tide rose high
enough to float the cutter.
During the time that the carpenter was thus occupied all the crew were
employed either in assisting him or in cutting wood and filling water; so
that I had no opportunity either of visiting the surrounding islands or
of examining the country in the vicinity of the bay: but when the repairs
were completed and the people were more at leisure I made an excursion as
far as Bat Island, off Cape Brewster.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account