World War, 1914-1918 -- Canada; World War, 1914-1918 -- Nova Scotia
The part played by the New Glasgow works of the Nova Scotia Steel and
Coal Company in the Great War is an interesting one. At the beginning of
hostilities in August, 1914, there were only two Steel Companies in the
United States who had either the plant or experience to produce either
shells or armor plates, while none of the Canadian steel plants had any
experience whatever.
The first production of munition material, by way of shells and shell
steel, was undertaken in Canada by the Shell Committee, and the story of
the experiments carried on in the early days of September, 1914, which
resulted in convincing the British War Office that basic steel, as made
in Canada, would meet all the requirements of both shrapnel and high
explosive shells, and which resulted in very large orders for munitions
coming to Canada, is well known to all Nova Scotians, and has become a
matter of history.
Between October, 1914, when the Scotia plants produced 22,000 shell
forgings, and the signing of the Armistice, November 11, 1918, the New
Glasgow plant had made more than 15,000,000 shells—these ranging in size
from the 15–pounder shrapnel to 12–inch high explosive, the local plant
being the only one in Canada which made the latter size. The total
tonnage of forged shells produced at New Glasgow amounted in round
figures to 180,000 tons. In addition to this a very considerable tonnage
of shell and other munition steel was shipped to be worked up in other
shell forging establishments in Canada and Great Britain. A further
considerable tonnage was worked up into marine forgings. British
shipyards about this time experienced great difficulty in obtaining
heavy marine forgings to meet Lloyd’s specification and tests. The
Scotia forges had long been on Lloyd’s list as approved makers of Marine
Forgings. The British shipbuilders’ difficulty was now met by Scotia,
which supplied to various yards on the Clyde, the East Coast, and other
yards complete sets of marine forgings of all classes for both
mercantile and other vessels of large tonnage. The total quantity of
marine forgings supplied Great Britain since the outbreak of war
amounted to 9,000 tons.
Most Nova Scotians are probably entirely ignorant of the considerable
amount of what might be called “research” and experimental work carried
out at the New Glasgow plant for the Government, and while this did not
produce the tangible results brought about in connection with the
manufacture of shells, not a little of the data and knowledge
accumulated, contributed in a very considerable degree to the successful
development of both the offensive and the defensive equipment of the
Allied forces.
While this work was being done secrecy was essential, nothing was said
and but little known of the work carried on along these lines. Now that
the War is over the necessity for secrecy appears to be past.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account