THE COST OF AN OCEAN RACER—INTRICATE “FINANCING” OF SUCH AN
UNDERTAKING—THE CONTRACT WITH THE SHIP-BUILDERS—THE UNCERTAIN ELEMENT
IN DESIGNING—GREAT SHIP YARDS ALONG THE CLYDE—THE PLANS OF A STEAMER
ON PAPER—ENLARGEMENT OF PLANS IN THE “MOULD LOFT”—WHAT IS MEANT BY
“FAIRING THE SHIP”—THE “SCRIVE BOARD”—LAYING DOWN THE KEEL—MAKING
THE HUGE RIBS—WHEN A SHIP IS “IN FRAME”—SHAPING AND TRIMMING THE
PLATES—RIVETING AND CAULKING—READY FOR LAUNCHING—THE GREAT “PLANT”
WHICH IS NECESSARY FOR THE BUILDING OF A SHIP—DESCRIPTION OF A
TYPICAL YARD—WORKS COVERING SEVENTY-FOUR ACRES—WHERE THE SHAFT IS
FORGED—THE LATHES AT WORK—THE ADJUSTMENT OF PARTS—SEVEN THOUSAND
WORKMEN.
I.
As often as the “record is broken,” and the Atlantic voyage is reduced
by some unprecedentedly fast passage, we may be sure that there is a
flutter in the offices of the rival lines which have thus been left
behind. Between the Cunard, the Guion, the Inman, and the White Star
lines there has been a constant race for supremacy, now one, and then
the other, taking the first place. No ship has been allowed to keep
the lead for more than a year or two. When sixteen knots have been
developed by one line, seventeen knots have been aimed at by another,
and the ship of that speed is no longer a wonder. So when we read in
the newspapers of the “fastest passage” we may take it for granted that
it is no sooner heard of in Liverpool than the managers of the lines
momentarily surpassed are preparing to beat it. If the triumph belongs
to the Cunard line, at the very next meeting of the directors of the
White Star and Inman lines it will be discussed, and though an order
for another ship may not be given there and then, it is sure to follow.
An order for a new ship of the class required to compete in the
modern passenger service of the Atlantic is not by any means a matter
to be determined on without grave consideration. Speed is costly,
and as you increase it it is generally necessary to also increase
the tonnage. Thus if the problem before you is to beat the record
of a seven-thousand-ton ship, which has developed eighteen knots
with engines of twelve thousand five hundred horse-power, you must
(principally for economic reasons) have a larger hull as well as more
powerful engines for your competing vessel. This forces upon your
consideration tides, channels, harbor-bars, and dock accommodations,
all of which impose limitations upon you. And then the cost of the
ship herself is not a matter which even the wealthiest of corporations
can provide for at a moment’s notice: it is not one hundred thousand
dollars, or five hundred thousand dollars that the work calls for, but
about five times the latter sum, for it is safe to say that a vessel
superior to the City of New York or the Etruria could not be built for
less than two million and a half of dollars.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account