California, Southern -- Fiction; Motion picture industry -- Fiction; Petroleum industry and trade -- Fiction; Political fiction
It was time for the “cementing off,” to make the well water-proof, and
protect the precious oil-sands. Down there under the ground was a pool
of oil, caught under a layer of impermeable rock, exactly like an
inverted wash-basin. The oil was full of gas, which made the pressure.
Now you had drilled a hole through the wash-basin, and the oil and gas
would come to you—but only on condition that you did not let any
surface water down to kill the pressure. All the way down you had been
tapping underground streams and pools of water; and now you had to set a
big block of cement at the bottom of the hole, solid and tight, filling
every crevice, both inside and outside your casing. Having got this
tight, you would drill a hole through it, and on down into the
oil-sands, thus making a channel through which the oil could flow up,
and no water could leak down. This was the critical part of your
operation, and while it was going on the whole crew was keyed up, and
the owner and his son, needless to say.
First you put down your casing, known as the “water-string.” If you were
a careful man, like Dad, you ran this “string” all the way up to your
derrick-floor. Next you began pumping down clean water; for many hours
you pumped, until you had washed the dirt and oil out of the hole; and
then you were ready for the cement-men. They came with a truck, a
complete outfit on wheels, ready to travel to any well. Another truck
brought the sacks of cement, a couple of hundred of them; the job called
for pure cement, no sand. They got everything ready before they started,
and then they worked like so many fiends—for this whole job had to be
put through in less than an hour, before the cement began to set.
It was an ingenious scheme they had, very fascinating to watch. They
fitted inside the casing a cast-iron “packer,” having rubber discs at
the top and bottom, so that it floated on the water in the casing; the
cement went on top of this. The sacks were jerked open, and dumped into
the hopper of the mixing machine, and the mixer began to revolve, and
the river of grey liquid to pour into the hole. It ran fast, and the
heavy pumps set to work, and drove it down, stroke after stroke. In half
an hour they had filled several hundred feet of the casing with cement;
after which they put on a rubber “packer,” fitting tight to the casing;
and again the heavy pumps went to work, and drove the mass of cement,
between the two “packers,” down into the hole. When they came to the
bottom, the bottom packer would drop, and the cement would pour in, and
the pressure of the top packer would force it into every cranny of the
hole, and up between the outside of the casing and the earth—one or two
hundred feet high it would rise, and when it set, there you would have
your “water shut-off.”
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account