During 1890 excessive rains and bad roads hindered work in
bore-sinking, instead of the dry periods which had been the cause of
embarrassment for the preceding seven years. The only newly completed
bore during this year was that at McKinlay, which at 1,002 ft. gave a
supply of 224,000 gallons a day. Water was struck in two other bores,
but of insufficient quantity, and work was still proceeding. The
obstacles encountered in boring, often from the breaking of machinery,
but more frequently from the want of thoroughly skilled drillers, must
have been disheartening, especially in cases where the sinking was
done without useful scientific information, and bores had to be
abandoned after months--even years in cases--of labour and worry.
In his report of 20th January, 1893, the Hydraulic Engineer discusses
at length the question of artesian water supply. The country is, he
holds, now in a much improved position to encounter long droughts.
Valuable information has been and is still being obtained by
exploration as to the prospects of artesian water being found, and
also as to the conservation of surface water by artificial means. He
says that fifteen bores, averaging 1,571 ft. each, have been sunk by
the department, and that although the work has been of a pioneering
character only one sunk to the contract depth has proved a failure. He
estimates that about 88,000 square miles in the western country have
been proved to be water-bearing, and he urges that as large areas
still remain to be explored the present is a favourable time for
inviting tenders for the work.
STREAM-GAUGING RECOMMENDED.
In this report the Hydraulic Engineer directs attention to
the necessity of acquiring information as to the extent of our
surface-water resources. In three of the southern colonies, he
mentions, a systematic practice of gauging streams has for some time
been in force. The work will be useless unless it is carried on for
a number of years. The essential thing to be ascertained is not the
maximum flow of a stream, but the minimum; or rather, perhaps, the
maximum that can be expected from a stream in a season of maximum
aridity. "Without such data," he continues, "no fair distribution of
water, no scheme of water supply, or irrigation, or drainage can be
well considered; nor can storage and distribution or drainage works be
economically designed, or their permanency and efficiency ensured."
He therefore urges the matter of stream-gauging upon the favourable
consideration of the Government, adding that the paramount necessity
of active administration in respect of water conservation generally
has been recognised by Parliament by legislation already placed upon
the Statute-book.
WASTE OF ARTESIAN WATER.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account