Since 1902 until this year annual reports at length have not been
furnished by the Hydraulic Engineer; but this year the work has been
resumed, and advance information supplied in a condensed form.
In the foregoing epitome of the Hydraulic Engineer's reports extending
over twenty-five years, no particular mention has been made of the
failures inevitable when either the Government or private persons
were engaged in deep boring for water exploration. The following
particulars show some of the obstacles encountered in tapping the
subterranean springs of our arid western country:--
In his report for 1902 the Hydraulic Engineer mentioned that a
contract had been entered into with Mr. W. Woodley for the sinking of
a bore at Eromanga to a depth of 2,000 ft. for the sum of L1,438, but
that work could not be prosecuted in consequence of the prevailing
drought in the West. The contract depth was reached on 29th August,
1903, without finding water. A further contract to carry the bore to
3,000 ft. was subsequently entered into, and on 30th June, 1904, at
a depth of 2,612 ft., the work was suspended until the arrival of
casing, which was delayed by rain. It was not until November, 1904,
that the casings reached the bore site, and that work could be
resumed. A suspension of work occurred on 4th March following for want
of a competent driller. Boring was resumed in August and continued
till March, 1906, without success. The only water tapped up to that
time was a supply of 10,000 gallons per diem at a depth of 1,640 ft.
The casings were allowed to remain in the bore, the gross cost of
which had been L4,480. In May, 1906, a new contract with Mr. Woodley,
for sinking another bore to a depth of 3,000 ft., was entered into. At
1,660 ft. a supply of 12,000 gallons a day was tapped; but, this being
considered insufficient, another contract for deepening the bore to
3,500 ft. was entered into with Mr. Woodley, the additional cost being
L1,000. On 9th March, 1908, the depth of 3,500 ft. was reached without
any additional supply. Then a contract for sinking a further 500 ft.
was entered into. At 3,980 ft. a small flow was tapped which dribbled
over the surface, and the 4,000 ft. depth being reached arrangements
were made for sinking another 100 ft. At 4,050 ft. a small flow of 110
gallons per hour was struck. At 4,135 ft. the flow increased to 250
gallons per hour. Delays occurred after this, until January, 1909,
when boring was resumed, and at 4,270 ft. a flow of 306,234 gallons
per diem was struck. The water was then brought under control,
and found to have a pressure of 219 lb. per square inch, with a
temperature of 198 degrees F. The water was fresh and drinkable,
though having a slightly gaseous taste; but this was not noticeable
after it had stood exposed to the air for a little time. On completion
of the surface fittings the discharge was measured, and the flow
ascertained to be 256,825 gallons per diem. The cost had not been
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account