United States. Navy; World War, 1914-1918 -- Naval operations
To accomplish the purposes they had in mind, the Navy Department engaged
the services of all available machinery welders and patchers, many of
whom were voluntarily offered by the great railroad companies. Most of
the time that was required was due not so much to actual repair work as
to the devious and tedious task of dismantling all machinery from bow to
stern of every ship in order to make certain that every bit of damage
was discovered and repaired. In this way all chance of overlooking some
act of concealed mutilation was obviated.
[Illustration: _From a photograph copyright by International Film
Service._ REPAIRING A DAMAGED CYLINDER OF A GERMAN SHIP FOR FEDERAL
SERVICE.]
It would appear that explosives were not used in the process of
demolition by the Germans, but at the time the engineers could not be
sure of this, and as a consequence as they worked they were conscious of
the danger of hidden charges which might become operative when the
machinery was put to the test, or even while the work of dismantling and
inspection was being carried on. There were, however, discovered, as a
result of this rigid investigation of every mechanical detail, many
artful cases of pipe-plugging, of steel nuts and bolts concealed in
delicate mechanical parts, of ground glass in oil-pipes and bearings, of
indicators that were so adjusted as to give inaccurate readings, of
fire-extinguishers filled with gasoline--in fact, the manifold deceits
which the Germans practised would make a chapter of themselves.
Suffice to say, that through painstaking investigation every trick was
discovered and corrected. On each vessel there was no boiler that was
not threaded through every pipe for evidence of plugging, no mechanism
of any sort that was not completely dismantled, inspected, and
reassembled. On one ship the engineers chanced to find a written record
of the damage inflicted. In every other case the search for evidence of
sabotage was blind. This memorandum in the case of the one ship was
evidently left on board through an oversight, and written in German, was
a veritable guide-book for our engineers. In order that the reader may
have some idea of the sort of damage done, the following extracts from
that memorandum of destructiveness is herewith presented:
"Starboard and port high pressure cylinders with valve chest; upper
exhaust outlet flange broken off. (Cannot be repaired.)"
"Starboard and port second intermediate valve chest; steam inlet flange
broken off, (Cannot be repaired.)"
"First intermediate pressure starboard exhaust pipes of exhaust line to
second intermediate pressure flange broken off. (Cannot be repaired.)"
"Starboard and port low pressure exhaust pipe damaged. (Cannot be
repaired.)"
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account