In order to reduce the weight of the bodies of the machines we first of
all took off the packing.
As the forward derrick could not swing the boats’ bodies clear of the
wing cases, which stretched over the railings, we had to take both
boats’ bodies in the after derrick. N 25, which stood aft, was lifted
first and swung out. It came nicely down onto the ice and N 24 followed.
The aft case with the wings was then turned so that it lay right across
the railings. Both cases were put on end so that we could get at the
hatches. The motor gondolas were then lifted up and put into their
places.
In the meantime the “Fram’s” boys hacked a glide from the fjord ice to
the land and the boats’ bodies were pulled along and taken straight to
the place which had been chosen for their mounting.
Our assistance for the mounting of them could not have been better. On
the one side a mechanical workshop and on the other a smithy, and a
big room which was put at our disposal. Here we had benches with vices,
etc.
For getting the wings ashore we had to get to the quay under all
circumstances, but there was no hurry now, as we had plenty to do
in getting the motors ready. It was not just the most comfortable
temperature to work in. Now and again one could see war-dances being
performed round the warming-pan.
In the meantime “Fram’s” boys cut the ice up round about the quay and
kept the water channels open so that the ships could change places more
easily.
Just when we had finished our work with the motors, “Skaaluren” left
the quay and “Hobby” came into her place. The wing-cases were just
lying at the same height as the quay, so that everything considered, it
was easy work to get them ashore. Luckily we had no wind that day, so
conditions permitted us to carry the cases on end, which was necessary
on account of the space.
Under the guidance of Schulte-Frohlinde we started immediately to mount
N 24, and soon it began to look more like a flying machine.
When taking N 24’s wings ashore, we had a good deal of wind. It was
therefore not easy to get them ashore on end. After landing them we had
to carry them in a horizontal position.
We could not wait for calm weather, as the meteorologists predicted a
long period of fresh breezes. The bringing ashore of the machines was
carried through without the slightest damage to the material, nor had
any damage taken place during the long transport from Marina di Pisa to
King’s Bay. All of us therefore had good reason to feel pleased that
day.
Whilst Schulte-Frohlinde, Feucht and Zinsmayer completed the mounting,
Green and Omdal continued their work with the motor and completed it by
putting on the propellers.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account