As the slide moves slowly downward, its colossal weight applied at
points where nature had made no provision for it, forces the earth
upward at the point where it can offer the least resistance, namely the
bed of the Canal. Sometimes this upheaval, so mysterious to the
non-technical mind, attains a height of eighteen feet. Again, the
friction of this huge mass of stone and gravel creates heat, which turns
into steam the rills of water that everywhere percolates through the
soil. The upheaval of the Canal bed, and the occasional outpourings of
steam have led at times to exaggerated and wholly unfounded reports in
the newspapers of volcanic action being one of the new problems with
which the Canal builders had to grapple.
The story told about the extent of the slides is sufficiently alarming,
but the calmness with which Col. Goethals and his lieutenants meet the
situation is reassuring. According to the official report there were
twenty-six slides and breaks in Culebra Cut to January 1, 1913 with a
total area of 225 acres. Since that date many others have occurred. It
is estimated that because of slides between 21,000,000 and 22,000,000
cubic yards of material in excess of the original estimate will have
been taken out of the Cut before completion. This is just about
one-fifth of the total amount of excavation, dry and wet, estimated
originally for the whole Canal. But the attitude of the engineers toward
this addition to their labors was merely one of calm acceptance of the
inevitable and a dogged determination to get the stuff out of the way.
The slides were an obstacle; so was the whole isthmus for that matter.
But all that was necessary was to keep the shovels working and the
slides would be removed and the isthmus pierced.
To my mind one of the finest evidences of the spirit animating the Canal
force was the fashion in which this problem of the slides has been
approached. It was at first disappointing, almost demoralizing, to find
over night the work of weeks undone and the day when “finis” could be
written to the volume put far over into the future. But the only effect
was a tighter grip on the pick and the shovel, a new determination to
force through the Canal. Culebra was approached as Grant approached
Vicksburg. To reduce it and to open the Canal to traffic, as Grant
opened the Mississippi to the steamboats of the nation, took more time
than was at first expected, but it had to be done. The dirt could not
always slide in faster than it could be carted out, for in time there
would be no dirt left to slide. And so, undismayed and intent upon
success, the whole force from Col. Goethals to the youngest engineer
moved on Culebra and the doom of that stubborn block to progress was
sealed.
[Illustration: SLIDE ON WEST BANK OF THE CANAL NEAR CULEBRA
Picture shows about 1,000,000 cubic yards of material moving toward the
cut at about three yards a day]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account