“It’s five hundred thousand cold cash,” said Mr. Griffiths to Gregory;
although in a burst of confidence later he had said: “What the dickens
I’m goin’ to do with that great wad of money when I get it beats me! It
turns me cold to think of it.”
Gregory had remained on the ranch two days, inventorying its stock,
buildings, and natural resources. He estimated that seventy-five per
cent. of the property was plow-land, the rest “rough, wooded, and
rolling.” There were several sets of buildings on it, and the cattle
and sheep sheds were in good condition. The cattle, sheep, and horses
could be sold on a rising market for $200,000, thus reducing the cost
of the land to four dollars an acre. After asking and receiving an
option for thirty days, Gregory intimated that he would like to extend
his trip into the mountains in search of float, and hired two riding
horses and a pack horse from his host, besides buying of him the
necessary food supply. Incidentally, in the course of conversation he
learned that there was a river “somewheres in the mountains between
thirty and forty miles northeast.”
He received more minute directions from a prospector regarding this
body of water, which was the object of his trip, and six miles from
Circle-G entered a ravine some twenty-five miles long. After climbing
one of the mountain sides that bounded the ravine, descending and
crossing another gulch, and climbing again, he and his companion saw,
far below, between the narrow walls of a cañon, an abundant mountain
stream.
The engineer proposed to divert this body of water to Circle-G Ranch.
Through the nearest mountain side he should drive a tunnel six hundred
feet long, and cross the short and crooked ravine with a thousand
feet of flume to a point where it would be necessary to drive another
tunnel, about two hundred feet in length. This would conduct the
diverted body of water into the long ravine, down which it would flow
to a point six miles above the ranch. Here the engineer purposed to
construct a dam thirty feet high for the purpose of raising the water
to an elevation from which it would flow through a canal or “ditch”, to
the more level portions of the ranch. A rough estimate of the cost of
this project, from headworks to ditch was $300,000.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account