The operations of the Pumpherston Oil Company are upon a scale of
considerable magnitude, for the Company’s works comprise the crude oil
plant, the sulphate of ammonia plant, oil and wax refineries, etc. The
Seafield and Deans works, 7 and 4 miles distant respectively, possess
only crude-oil and sulphate-producing plants, the refining plants being
confined to Pumpherston. The Company’s works cover 100 acres, while
the shale fields extend over many thousands of acres in and around the
district of Pumpherston.
As has already been mentioned, the shale fields so far operated
lie, in the main, in the Lothians, and, as one motors by road from
Edinburgh to Glasgow, the shale country is passed through. Before
the commercial development of a shale field, trial borings are sunk,
now more generally by means of a diamond bore, for by its revolving
action a solid core is obtained which readily shows the character and
inclination of the strata passed through. When a seam of shale has been
found by boring operations, and the exact position and depth of outcrop
determined, it is necessary, before sinking a mine, to put down a trial
shaft for the purpose of making sure as to the true gradient at which
the shale is lying, and the thickness as well as the quality of the
same.
In the shales in the Pumpherston district there are five distinct
seams, dipping from 29 degrees to 38 degrees, and the mine is driven in
the middle seam, the other seams being entered by level cross-cut mines
driven from one to another. Each of these seams is worked separately,
the cross-cut shown in the sketch serving the purposes of communication
and transit. In some cases, where the inclination of the shales is at
a different angle, it is necessary to sink a vertical shaft, and this
method is applied to the series known as the Mid-Calder.
The usual dimensions of the inclined shaft are a width of from 10
to 12 feet, and the height is from 6 to 8 feet. If the sides of the
shaft prove to be of a soft nature, as is generally the case with the
shale at the crop, walls are run up and the roof is supported by larch
crowns, but, where the shale is hard and the roof good, then the less
costly method of timbering is adopted.
The supports to the roof in many cases are fixed “centre” fashion,
dividing the shaft into two unequal parts. The smaller division has
generally a width of just over 3 feet, and is used for haulage ropes
and water pipes, while the larger division is utilized for winding.
During the progress of sinking, levels are broken away in the seam at
regular distances, and driven so as to get communication with, and
drive headings to form, the outer mine. These headings are driven in
the same direction as the sinking mine to the levels above, until
they connect with the outer mine or shaft. The outer mine is then
used for winding the shale up to the surface, and the other is kept
for sinking purposes, and by this means winding and sinking can go on
simultaneously.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account