The gangway is not driven continuously, but after being driven about 55
feet on either side of the shaft, the breasts are started 25 feet from
the shaft, a pillar being left to protect it. The breast is then opened
up to the face of the gangway, and when one ore-breast is worked out,
the gangway is driven ahead about 30 feet, and a new breast is opened
and worked out before commencing a third. The air-hole is first driven
to the surface, then the breast is opened to its full width of 6 feet.
The thickness of the bed of ore here varies from 4 to 6 feet, depending
upon the thickness of the partings of clay and slate. The clay and
slate are left on the bottom, which is made sloping to allow the ore to
roll down to the shute; this is 6 feet wide and 4 feet long and heavily
timbered. Small props or sprags are hitched into the cement, and wedged
with a lid on the clay side to prevent falls of rock.
The holes are drilled by hand in the clay-partings. They vary in depth
from 1 to 4 feet, and the charge of dynamite is varied correspondingly,
according to the amount of ore it is desired to throw down. The loose
ore is wedged down with crowbars and picks, and is then freed from
any adhering clay and thrown down the shute. It is there loaded into
boxes holding about half a ton each, which are pushed to the shaft on
a truck. The ore-boxes have four rings at the corners, to which are
attached four chains, suspended from the wire hoisting-rope. At the top
of the shaft the boxes are detached and placed on a truck, which is run
to the dump. Thirty cars, averaging 15 tons, are extracted in a day
of two shifts, the day-shift working nine hours and the night-shift
eleven. The pay of the miners is 5_s._ per shift. The cost of mining
the ore averages 7_s._ per ton.
The ore, as it comes from the mines, is free from refuse, great care
having been taken to separate slate and clay from it in the working
places. It is hauled in 2-ton wagons to kilns, which are situated on a
hill-side for convenience in charging. The platform upon which the ore
is dumped is built from the top of the kiln to the side of the hill.
The ore is first spalled to fist-size and freed from slate, and is then
carried in buggies to the charging-hole of the kiln.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account