Pigments, Paint and Painting: A practical book for practical menTerry, George
Science
Pigments, Paint and Painting: A practical book for practical men
Terry, George
Paint; Painting, Industrial; Pigments
_Area Covered._--For every 100 sq. yd., besides the material enumerated
in the foregoing, 2½ lb. white lead and 5 lb. putty will be required
for stopping. The area which a given quantity of paint will cover
depends upon the nature of the surface to which it is applied, the
proportion of the ingredients, and the state of the weather. When the
work is required to dry quickly, more turpentine is added to all the
coats. In repainting old work, two coats are generally required, the
old paint being considered as priming. Sometimes another coat may
be deemed necessary. For outside old work exposed to the sun, both
coats should contain 1 pint turpentine and 4 pints boiled oil, the
remaining ingredients being as stated in the foregoing table. The
extra turpentine is used to prevent blistering. In cold weather, more
turpentine should be used to make the paint flow freely.
According to another authority, it is found that in painting wood,
one coat takes 20 lb. lead and 4 gal. oil per 100 sq. yd.; the second
coat, 40 lb. lead and 4 gal. oil; and the third the same as the second;
say 100 lb. lead and 16 gal. oil per sq. yd. for the three coats. The
number of square yards covered by one gallon of priming colour is found
to be 50; of white zinc, 50; of white lead paint, 44; of lead colour,
50; of black paint, 50; of stone colour, 44; of yellow paint, 44; of
blue colour, 45; of green paint, 45.
_Measuring._--Surface painting is measured by the superficial yard,
girting every part of the work covered, always making allowance for
the deep cuttings in mouldings, carved work, railings, or other work
that is difficult to get at. Where work is very high, and scaffolding
or ladders have to be employed, allowances must be made. The
following rules are generally adopted in America in the measurement
of work:--Surfaces under 6 in. in width or girt are called 6 in.;
from 6 to 12 in., 12 in.; over 12 in., measured superficial. Openings
are deducted, but all jambs, reveals, or casings are measured girt.
Sashes are measured solid if more than two lights. Doors, shutters and
panelling are measured by the girt, running the tape in all quirks,
angles or corners. Sash doors measure solid. Glazing, in both windows
and doors, is always extra. The tape should be run close in over the
battens, on batten doors, and if the stuff is beaded, add 1 in. in
width for each bead. Venetian blinds are measured double. Dentels,
brackets, medallions, ornamented iron work, balusters, lattice work,
palings, or turned work, should all be measured double. Changing
colours on base boards, panels, cornices, or other work, one-fourth
extra measurement should be allowed for each tint. Add 5 per cent. to
regular price for knotting, puttying, cleaning, and sand-papering. For
work done above the ground floor, charge as follows:--Add 5 per cent.
for each story of 12 ft. or less, if interior work; if exterior work,
add 1 per cent. for each foot of height above the first 12 ft.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account