_Concrete._—The walls of tanks made of concrete depend for their cost
upon the cost of the material and the cost of the labor involved. It is
usually more economical to use gravel as the basis of the concrete if
any is available, and in order that the product may be of good quality
it is always best to screen this gravel, separating it into sand and
stone. The proper size of screen for this operation should be not
greater than one-half-inch mesh. The stone and sand can then be
re-combined with the cement in the proportion of one part of cement to
two and a half parts of sand to five parts of stone, this mixture making
a very strong and impervious combination. The cost of this mixture
depends chiefly on the length of haul for the gravel and on the natural
grading of the material. If the proportions required for concrete exist
naturally in the bank or stream bed from which the gravel is to be
obtained, there is little or no waste involved in screening, and the
only cost is that of handling the material twice. If, on the other hand,
the amount of stone is inadequate, it may be necessary to waste a good
deal of the fine sand and enough material has to be shovelled to produce
the required amount of coarse media. Assuming that the cost of
shovelling the material from the stream bed is fifteen cents a cubic
yard, and that the haul is two miles, so that four trips a day are made,
then the gravel can be delivered where it is to be converted into
concrete at a cost of one dollar for hauling and thirty cents for
shovelling, while if the haul is only one mile, so that eight trips a
day can be made, the cost will be eighty cents per cubic yard. If any
waste of gravel is necessary, these costs will be increased
correspondingly.
At the site of the proposed plant the sand and gravel must be mixed with
the cement and carried to place. It has been found by experience when
the mixing is done thoroughly and by hand, and when the resulting
concrete can be shovelled directly behind the forms, that the cost of
the mixing and placing is about one dollar per cubic yard of concrete.
If the concrete has to be wheeled into place this cost will be added to.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account