Goods may by law be kept in some of the countries which have been
mentioned for two days before being despatched; two clear days are
allowed for 186 miles or part thereof; and when rapid transit is
required, as in case of express goods, the rates are much higher
than those charged by goods train. In this country, on the other
hand, goods are, as a rule, forwarded on the day or during the night
of the day on which they are brought to the station; and between
important places within 200 miles, goods are usually delivered
the following day. As a matter of general practice, the maximum
time allowed abroad is not fully occupied; but it is recognised
by law. This advantage which the foreign railways possess implies
others, which can only be fully appreciated by persons practically
acquainted with the mystery of railways. The ample time allowed
before forwarding and in transit permits of considerable economy in
the use of wagons. Opportunities are afforded for making full wagon
and full train loads. This circumstance, too, reduces train mileage.
A further consequence is the diminution of claims for compensation
and in other items of expense. The speed of the trains being slow,
and the time allowed in transit being great, larger loads are
practicable.
Liability for compensation for delay or damage in transit is
another element to be taken into consideration in any comparison
of rates. In Belgium and Holland, where rates are especially low,
the liability to pay compensation is very limited. Belgian railway
companies are not responsible in the case of goods carried under the
conditions of tariff No. 2, unless specially insured, for a delay
of one day after the time allowed for delivery, or in the case of
goods carried under tariff No. 3 (all consignments above 4 cwts.),
for a delay of two days after the time allowed for delivery. Their
responsibility for delay in excess of these times is, moreover,
limited to one-tenth of the carriage for every day’s delay. Goods
are considered to be lost if not delivered after the expiration
of fifteen days. For loss or damage to merchandise, carried by
goods train, the companies are responsible only to the extent of
75 cents. per kilogramme (3½d. per lb.). The responsibility of the
companies in Holland, for delay to ordinary goods beyond 24 hours,
after the time allowed for delivery, is, up to 72 hours, limited to
one-fourth, up to 8 days one-third, and beyond that period one-half
of the freight. For whole or partial loss the maximum liability is
£2 10s. per cwt. To enable the public to recover, either in the case
of delay or loss, the full value of goods, they must be insured at
specified rates. These particulars show the advantages of foreign
railways in this respect; the difference may be made still clearer
by citing a few figures as to the working of this system of legal
limitation of liability in Belgium and Holland and of the virtually
unlimited liability in force in this country. In Belgium the amount
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account