Australia has not made as rapid progress in respect of the construction
of railways as might perhaps be expected. She has not, however, been
altogether unmindful of her interests in this respect. Of the four
great modern divisions of the Australian Continent, New South Wales
had, at the commencement of the present year, 263 miles, and the
expenditure upon them had been £2,746,373; Victoria, 272, with an
expenditure of £9,905,634; Queensland, 78, with an expenditure of
£617,658; and South Australia, 56. The expenditure for railways in this
last-named colony is not stated in the returns before us. It will thus
be seen that the aggregate length of the Australian railways is 669
miles.
In the New South Wales Province there are three main lines, all of
which commence at Sydney—the Great Southern, the Great Western, and
the Great Northern. The first is to extend through Goulburn to the
Murray River at Albury. Although some of the works on this line
are very heavy, and there is a long tunnel to complete through the
Gibraltar Mountains, it is, nevertheless, expected that the line will
be completed in 1868. The Great Northern will extend to Muswell Brook
on the Hunter River, sixty miles north-west of Maitland, and 153 miles
from Sydney. The third, or Great Western Line, is to extend to Bathurst
on the Macquarie River, 122 miles from Sydney. New South Wales has
its Windsor and its Richmond, and these places are accommodated with
railway communication from Sydney. When the several lines now open, and
those now in process of construction, are completed, the Colony will
have 500 miles of railway within its limits.[112]
The Victorian railways consist of two main lines, one from Melboure
to Castlemain (Mount Alexander Goldfields) and Sandhurst (Bendigo
Goldfields), 101 miles long, and the other from Melbourne to Geelong
and Ballarat, with a branch to Williamstown (the Port of Melbourne).
The total length of this second line is ninety-six miles. The Geelong
and Melbourne Railway was purchased from the shareholders by the
Government in 1860. An extension from Sandhurst to the Murray River at
Echuca, fifty-six miles long, is in progress, and will be opened next
year. Echuca is 150 miles distant from Albury, the terminus on the
Murray River of the intended southern extension of the New South Wales
Railways. There will, therefore, not be direct railway communication
between Sydney and Melbourne, at all events for the present. The gauge
of the New South Wales and Victorian Railways is 5 feet 3 inches.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account