The Stanedge Tunnel on the Huddersfield Branch of the London and
North-Western Railway is exactly 3 miles long, and it is also a single
line tunnel; the gradient is nearly a level. The time for passenger
trains through it is six minutes, or at the rate of 30 miles an hour;
the time for goods trains is nine minutes, or at the rate of 20 miles
an hour. The deepest portion of the tunnel is 600 feet below the upper
surface of the mountain.
On the 3rd September, 1867, we came through the Shepherd’s Well Tunnel
of the London, Chatham and Dover Railway, 2,376 yards long, against
the gradient, which is 1 in 100, or 53 feet in the mile for two-thirds
of its length, and the remainder nearly level, in two minutes fifteen
seconds; on the same day we came through the tunnel in the opposite
direction, when the time occupied was one minute forty-two seconds:
on the other hand, Mr. Allport, the General Manager of the Midland
Railway, to whom we gladly acknowledge ourselves indebted for much
valuable information most obligingly afforded, says that the passenger
trains are timed to run _in each direction_ through the Dove’s Hole
Tunnel 2,420 feet long at the same rate of speed, and actually do run
at that speed—nearly 46 miles an hour,—yet the gradient is 1 in 90, or
58⅔ feet per mile. The same for goods trains, their speed is 23 miles
an hour in each direction, and Mr. Allport assures us they maintain it
in both directions.
The following are the lengths of some of the principal railway tunnels
in Great Britain and of the two longest in Ireland:—
Name. Company. Yards.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account