Oakley ” 800
Bishopton Glasgow and South-Western 760
Coates Park Midland 740
Buckhorn Weston Salisbury and Yeovil 739
Belmont Chester and Holyhead 737
Penmaen Bach Chester and Holyhead 721
Tottenham Great Northern 714
Leeds North-Eastern 700
Copenhagen Great Northern 694
Dover Chatham and Dover 682
Manton Midland 660
Ampthill ” 640
Chivet ” 620
Martello South-Eastern 616
Barnet Great Norther 605
Chelsfield South Eastern 600
(A) Followed by an open cutting of 100 yards; then a tunnel of 440
yards. The gradient in these tunnels is 1 in 70. For full details
respecting them, see Paper read by Mr. Charles Nixon at the Institution
of Civil Engineers. _Proceedings_, volume for 1842.
Some of our tunnels have been extremely costly, the Kilsby, for
instance, £125 per yard forward, total £302,000. The face of the
Primrose Hill Tunnel at its London end cost £7,000, thereby adding to
its total cost at the rate of £5. 15s. a yard. Up to 1857, the average
cost of all tunnels was £102 per yard, or for 70 miles £12,320,000.
Tunnels have certainly been constructed more cheaply since then.[129]
Mr. J. G. Fraser assumes them to have cost at the average rate of
£45 per lineal yard, but this must be considerably below the mark,
notwithstanding that many of the more recently constructed tunnels have
only been for “single line.” The dimensions of these tunnels on the 4
feet 8½-inch gauge, are usually as follows:—12 feet wide at rail level,
17 feet from rail level to soffit, whilst for a double line of the same
gauge tunnels are usually about 25 feet wide at rail level, and about
22 feet from rail level to soffit. On the exceptional Great Western
gauge, they would be respectively about a fourth higher and a third
wider.
We must only touch the Thames Tunnel at a tangent. Its length is 1,200
feet with two arches each 13 feet 9 inches at the springing of the
arch; 16 feet 4 inches high from the invert. It cost £1,000 a yard, or
for 400 yards £400,000, two and a-half times as much per yard forward
as the most expensive estimate for the Mont Cenis Tunnel, more than
three times as much as its cost per yard forward up to the present
time. In addition, the approaches of the Thames Tunnel (for foot
passengers only) cost £54,714, total £454,714. It is now about to be
utilised as a railway tunnel, having been purchased by the East London
Railway Company for the purpose of bringing together the lines at the
north-eastern and south-eastern ends of London.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account