The St. John’s Wood Railway, which starts from the Baker Street Station
of the Metropolitan Railway, is in tunnel throughout, and is a series
of stiff gradients, culminating with the stiffest of all at its St.
John’s Wood end. The line is 2¾ miles long, and its total rise in
this length will be 255 feet, but the elevations are very unequally
distributed. Starting from Baker Street Station, it proceeds for a
short distance on a level, and then it rises 1 in 90 and 1 in 44 to
the Regent’s Canal. From the canal the line descends slightly, and
then at three quarters of a mile from Baker Street will commence an
ascent of 1 in 60, or at the rate of 88 feet in the mile, for 660
yards. Then follows an incline of the same length of 1 in 150 (35
feet in the mile), then for 440 yards nearly level, except, just for
a few yards, 1 in 80. At one mile and 1,320 yards from Baker Street
commences a gradient of 1 in 27, or 196 feet in the mile for a length
of 1,320 yards. Half way up the gradient will be a station, but the
steepness of the gradient will be diminished for about 200 feet to 1
in 250, or 21 feet in the mile. Mr. John Fowler, the President of the
Institution of Civil Engineers, is engineer of the Metropolitan, the
Metropolitan District, and the St. John’s Wood Railway Companies. The
construction of an extension of this last-named line to Hampstead has
been authorised.
The longest tunnel in Europe _over_ land and over water is the
Britannia Tubular Bridge built across the Menai Straits, parallel to
and some mile and a-quarter from Telford’s beautiful Suspension Bridge
opened for road traffic in 1829. It is 1,834 feet 9 inches long, and
in fact consists of two independent wrought iron tubes, each placed
alongside of the other. There are four spans, two of 460 feet each,
and two of 230—that is, the tubes rest upon two abutments and three
towers of masonry—at an elevation of 100 feet above high water mark.
The tower called the Britannia Tower is built upon a solid rock that
projects above high water nearly in the centre of the Channel. The
summit of this tower is 130 feet higher than the level of the railway
in the tubes. The total weight of iron in the tubes is 9,360 tons, each
tube of 460 feet weighs 1,587 tons, each of 230 feet weighs 753 tons,
but these weights of iron are greatly in excess of what would be put
in tubular bridges of like spans at the present time; and for a length
but little exceeding a third of a mile, one tube, and not two, would be
considered more than sufficient for all traffic, in both directions,
that could be conveyed through it. The tubular bridge across the
Conway River, forty-five miles from Chester, consists of two tubes
placed alongside each other, each is 400 feet long and 1,180 tons. The
combined cost of the two bridges, Britannia and Conway, is always set
down at a million sterling. Now-a-days they would be constructed for
about half that amount.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account