So far as regards tunnels actually constructed. We now come to speak
of tunnels suggested. These may he divided into two classes—tunnels
under rivers and tunnels under the ocean. Of the former, the first
to he mentioned is that proposed to he constructed under the Mersey,
to connect its Cheshire and Lancashire sides together. The scheme is
propounded by Mr. John Hawkshaw, the eminent engineer, in a letter
which he addressed to the Mersey Dock and Harbour Board, on the 31st
of August last. Mr. Hawkshaw having stated that it is evident a bridge
or viaduct over the river would interfere with the navigation, whilst
the sand-stone rock which underlies its bed affords facilities for the
construction of a tunnel, proceeds to show that the river should be
crossed between New Brighton and Bootle, that being the best point for
connecting together the dock lines of railway on each side of the river
Mersey.
The cost is set forth as follows:—
Total length of lines 9¼ miles; length of tunneling, 4,800 lineal
yards: estimated cost £785,000.
The lowness of the estimate is owing to it not being necessary to
pass through valuable property, or important commercial buildings of
any kind. Nevertheless Mr. Hawkshaw feels that the usual allowance
for contingencies should be increased from 10 to 20 per cent. on the
outlay. Still it brings the total amount considerably under a million.
Mr. Hawkshaw does not ask the Mersey Docks and Harbour Board to be at
the total cost of these works, however important it is that the two
several portions of the board’s establishment should be closely united
in the manner which this tunnel accomplishes, but that it should only
contribute a portion of the outlay—an outlay which he considers will
not be more than a third of what will be required for accomplishing
any other of the schemes that have been proposed for carrying a tunnel
under the Mersey.
In 1864 the Dublin Trunk Connecting Railway obtained an Act for the
construction of a railway in the immediate vicinity of Dublin. Part of
the plan sanctioned by Parliament is a tunnel under the Liffey, less
than half a mile from its mouth. The depth of the tunnel-top under
the bed of the river will be 20 feet. The stratum of limestone rock
is curiously placed where the tunnel is to be pierced. The bottom of
it will rest upon the rock, but the tunnel itself will be constructed
through the superjacent clay. It will be lined with brick in cement.
Its length under the river is to be 324 yards, and the approaches to
it, which are to be constructed in the manner known as “cut and cover,”
are to be 430 yards each. The gradients on both sides will be 1 in 70,
or 75½ feet in the mile. The cost is estimated by Mr. John Burke, the
engineer for its construction, at £200 per yard forward.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account