Captain Tyler in his report of 1866, sets down the total cost of the
tunnel and its 34½ miles of approaches at £5,400,000, or £128,500 per
mile. Now we know that up to the present time each metre of tunnel
excavated and lined (for it is to be lined throughout from stone
quarried near to each entrance, with an occasional introduction of
brickwork) costs 7,000 francs, or £280. This would bring its total cost
exclusive of permanent way, which would be, say £30,000, to £3,421,600,
but we believe that the farther the tunnel is penetrated, the expenses
will increase rather in geometrical than arithmetical proportion,
and that the average cost of the tunnel will not be 7,000 francs or
£280 “_per metre courant_,” but 10,000 francs or £400. If this be so,
the cost of the tunnel, without permanent way, would be £5,188,000.
To this sum has to be added the cost of the 34½ miles of approaches.
The nature and the probable cost of the works can be appreciated from
the fact that they are now about to be let, and the contract time for
their completion is to be four years and a-half from the date of their
commencement. These 34½ miles of double railway cannot be estimated at
less than £60,000 a mile or £2,070,000, making the total cost of the
tunnel and of the railways which connect it with the railways of France
to the north, and with those of Italy to the south, £7,258,000, or at
the rate of £172,800 per mile. Possibly, if the construction were in
the hands of a railway company instead of those of two governments, a
saving of a million or so might be effected, but in any case the cost
would be upwards of £6,000,000, or nearly £142,850 a mile.
In connection with the subject of cost, a calculation of Captain
Tyler’s gives the following results. The difference, says the Captain,
of elevation between the outer summit of the Mont Cenis Pass and the
summit of the railway through the tunnel is 2,520 feet. The excess of
working expenses in consequence of this difference of height, estimated
on a traffic ten times as great as that which passed over the Mont
Cenis in 1865, and the cost of traction per horse power and per hour
being taken at 2¼d. (the cost on the Sœmmering and the Giovi), an
additional capital of £650,000, or £13,000 a mile, with interest taken
at 6 per cent., is represented. If then £13,000 a mile be added to
the £21,000 actual cost per mile of a permanent Alpine railway, the
total cost of a railway _on_ the mountain becomes, for the purposes of
comparison, £34,000 a mile, as against whatever may be the cost per
mile for the Tunnel Railway and its approaches. If they cost £142,850 a
mile, the comparison will be as 31 to 142; but, if, as we believe, the
cost will be £172,800, then the proportion will be at 31 to 172.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account