SECT. 3. The governor and council shall annually appoint a state
engineer for the purpose of examining and determining monthly the amount
and value of the work done, and materials delivered on the railroad and
tunnel of the Troy and Greenfield Railroad Company, who shall receive an
annual salary of one thousand dollars, payable quarterly. The state
engineer shall forthwith fix permanent marks in each end of the Hoosac
Tunnel, marking the progress of the work up to February twenty-fourth,
eighteen hundred and sixty, from which to determine the progress
subsequently made. He shall also determine by suitable notes, marks, or
observations, the amount and value of all grading, bridging, masonry, or
other work done, or iron, or other materials delivered on the road east
of the Hoosac Tunnel prior to December twenty-second, eighteen hundred
and fifty-nine, and fix data from which to determine the value of any
work, or materials delivered subsequent to the date last named. He shall
monthly, immediately after the first day of each month, estimate the
proportion which the work done upon the road, since the preceding
estimate, bears to the whole of the work required to be done in the
graduation, masonry, bridging, and superstructure of said railroad east
of the Hoosac Tunnel, and also the work done in the excavation of said
tunnel, which he shall certify separately to the governor, together with
the amount of state scrip to which the company is entitled under the
provisions of this act. Such monthly estimates shall be based upon a
width of road-bed at grade of fifteen feet, on embankments, seventeen
and a half feet in side-cuts, and twenty feet in thorough-cuts; in the
heading of the tunnel, upon dimensions fourteen feet wide and six feet
high in the middle, and in the finished excavation of the tunnel of
fourteen feet wide and eighteen feet high in the middle.
The deliveries of scrip shall be at the rate of fifty dollars for each
lineal foot of tunnel, divided between heading and full sized tunnel, in
the proportion' of thirty dollars for each lineal foot of heading and
twenty dollars per lineal foot for the remaining excavation; and of six
hundred and fifty thousand dollars for the whole of the graduation,
masonry, bridging and superstructure of the unfinished portion of the
road east of the tunnel.
The scrip shall be delivered on the road in the proportion which the
value of the work done and the materials delivered each month bears to
the estimated cost of the whole work and materials required on the
portion of road aforesaid.
No expenditures shall be required merely for the purposes of ornament,
but the work shall be substantially performed, and the rails shall weigh
not less than fifty-six pounds to the lineal yard; for any defective
materials or work, a proportionate amount of scrip shall be withheld.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account