When an estuary is thus partly trained, the deepening due to the
training does not extend far beyond the point where the walls
terminate. The deposit of material along the sides of the estuary
may, however, extend some distance further down in places where the
tide can no longer have free play. This occurred in the Seine estuary
(fig. 68). The authorities of Havre, which lies at one side of the
estuary not far from its mouth, feared that if the training walls were
brought further down, the deposits might extend to their neighbourhood.
The reduction in the capacity of the estuary, due to the deposits,
caused it to become filled up more quickly, and the time of high water
at Havre was advanced. The dotted lines show a good arrangement of
training walls proposed by Harcourt.
There is no doubt that it is always feasible to carry training walls
right through an estuary, or at least down to a point where deep water
is reached, and if a proper funnel shape is given to the channel the
reduction of the tidal flow and silting up of the spaces behind the
walls need not cause any trouble. Training the complete estuary was
carried out in the case of the Tees, where, however, the estuary was
not of great length, and was not of a good shape for keeping itself
open. Any affluents entering the estuary can be provided with separate
trained channels. Difficulty may, however, arise if there are towns
which would be shut off from the estuary by the silt banks.
Generally the line selected for the trained or dredged channel should,
though it must be as short and direct as possible, coincide as nearly
as possible with that which the water naturally tends to keep open.
This may be toward one side of the estuary or the other, according to
the direction from which the tidal wave approaches. In the case of
the Dee, the best line was not adopted, attention having been chiefly
given to the question of silting up the spaces outside the walls and so
reclaiming land, a matter which should always be treated as of quite
secondary importance. Training walls in estuaries are generally built
only up to half-tide level. Were it not for the expense they might be
built up to high-water level. In the Seine estuary the walls were made
of blocks of chalk.
Whether a trained channel will keep itself open or will need periodical
dredging depends, of course, on the amount of silt in the water and on
its velocity and depth. The question must be worked out and calculated
as in the case of a non-tidal river.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account