At Manchester, New Hampshire, the present works were commenced in 1835.
The Merrimack River at this point has a fall of about fifty-two feet,
and furnishes, at a minimum, about ten thousand horse power during the
usual working hours.
At Lawrence, Massachusetts, the Essex Co. built a dam across the
Merrimack River, commencing in 1845, and making a fall of about
twenty-eight feet, and a minimum power, during the usual working hours,
of about ten thousand horse power.
At Holyoke, Massachusetts, the Hadley Falls Co. commenced their works
about 1845, for developing the power of the Connecticut River at that
point, where there is a fall of about fifty feet, and at a minimum,
about seventeen thousand horse power during the usual working hours.
At Lewiston, Maine, the fall in the Androscoggin River is about fifty
feet; its systematic development was commenced about 1845, and with the
improvement of the large natural reservoirs at the head waters of the
river, now in progress, it is expected that a minimum power, during
the usual working hours, of about eleven thousand horse power will be
obtained.
At Birmingham, Connecticut, the Housatonic Water Co. have developed the
water power of the Housatonic River by a dam, giving twenty-two feet
fall, furnishing at a minimum about one thousand horse power during the
usual working hours.
The Dundee Water and Land Co., about 1858, developed the power of the
Passaic River, at Passaic, New Jersey, where there is a fall of about
twenty-two feet, giving a minimum power, during the usual working hours,
of about nine hundred horse power.
The Turners Falls Co., in 1866, commenced the development of the power
of the Connecticut River at Turners Falls, Massachusetts, by building a
dam on the middle fall, which is about thirty-five feet, and furnishes
a minimum power, during the usual working hours, of about ten thousand
horse power.
I have named the above water powers as being developed in a systematic
manner from their inception, and of which I have been able to obtain
some data. In the usual process of developing a large water power, a
company is formed, who acquire the title to the property, embracing the
land necessary for the site of the town, to accommodate the population
which is sure to gather around an improved water power. The dam and
canals or races are constructed, and mill sites, with accompanying
rights to the use of the water, are granted, usually by perpetual leases
subject to annual rents. This method of developing water power is
distinctly an American idea, and the only instance where it has been
attempted abroad, that I know of, is at Bellegarde in France, where
there is a fall in the Rhone of about thirty-three feet. Within the last
few years works have been constructed for its development, furnishing a
large amount of power, but from the great outlay incurred in acquiring
the titles to the property, and other difficulties, it has not been a
financial success.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account