In taking this chair, it has been usual, when meetings have been held
out of London, for your president to give some account of the works of
his own town. In the present instance I feel that I can dispense with
this course, in so far as that I need not do more than generally
indicate what has been the course of events since I read to a largely
attended district meeting in May, 1884, a paper on "The Public Works
of Leicester." At that time large flood prevention works were in
course of construction, under an act obtained in 1881, for continuing
the river improvement works executed under previous acts. The works
then under contract extended from the North Mill Lock and the North
Bridge on the north to the West Bridge and Bramstone Gate Bridge on
the south, along the river and canal, and included bridges, weirs,
retaining walls, and some heavy underpinning works in connection with
the widening and deepening of the river and canal. These works were
duly completed, as well as a further length of works on the River Soar
up to what is known as the old grass weir, including the Braunstone
Gate Bridge, added to one of the then running contracts, at a total
cost, excluding land and compensation, of L77,000. At this point a
halt was made in consequence of the incompleteness of the negotiations
with the land owners on the upper reach of the river, and this,
together with various other circumstances, has contributed to greater
delay in again resuming the works. In the interval, a question of
whether there should be only one channel for both river and canal
instead of two, as authorized by the act, has necessarily added
considerably to the delay. But as that has now been settled in favor
of the original parliamentary scheme, the authority of the council has
been given to proceed with the whole of the works.
One contract, now in progress, which members will have an opportunity
of inspecting, was let to Mr. Evans, of Birmingham, in March last, for
about L18,000. It consists of a stone and concrete weir, 500 feet in
length, with a lock of 7 feet 6 inches lift and large flood basins,
retaining and towing path walls, including a sunk weir parallel with
the Midland Railway viaduct. This contract is to be completed by March
next. The remainder of the works about to be entered upon include a
new canal and flood channel about 1,447 yards long, and the deepening
and widening of the River Soar for a length of about 920 yards, with
two or three bridges.
* * * * *
THE CHEMISTRY OF THE COTTON FIBER.
By Dr. BOWMAN.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account