Sewerage and Sewage TreatmentBabbitt, Harold E. (Harold Eaton)
History
Sewerage and Sewage Treatment
Babbitt, Harold E. (Harold Eaton)
Sewage disposal; Sewerage
1st. Water smoking, which lasts about 72 hours during which the
temperature is raised gradually to 350 degrees Fahrenheit.
2nd. Heating, during which the temperature is raised to 800 degrees
Fahrenheit in 24 hours.
3rd. Oxidation, during which the temperature is raised to 1,400 degrees
Fahrenheit in 84 hours.
4th. Vitrification, in which the temperature is raised to 2,100 degrees
Fahrenheit in 48 hours, and finally,
5th. Glazing, during which the temperature is unchanged but salt (NaCl)
is thrown in and allowed to burn.
Oxidation must be complete before vitrification is started as otherwise
blisters will be raised due to imprisoned carbon dioxide. The important
points in vitrification are to make the required temperature within a
reasonable time and to maintain a uniform distribution of heat
throughout the kiln. When vitrification is complete as shown by a glassy
fracture of a broken sample taken from the kiln, glazing is accomplished
by throwing a shovelful of salt on the hottest part of the fire. About
five to six applications of salt from two to three hours apart may be
needed. The kiln is then allowed to cool and the manufacture of the pipe
is complete. The completeness of vitrification is indicated by the
amount of water that the finished pipe will absorb. Completely vitrified
pipe will absorb no moisture. Soft-burned pipe may absorb as much as 15
per cent moisture.
Vitrified clay blocks are made of the same material and in the same
manner as vitrified clay pipe.
The following data on vitrified pipe have been abstracted from the
specifications for vitrified pipe adopted by the American Society for
Testing Materials.
Pipes shall be subject to rejection on account of the following:
(_a_) Variation in any dimension exceeding the permissible
variations given in Table 36.
(_b_) Fracture or cracks passing through the shell or hub, except
that a single crack at either end of a pipe not exceeding 2 inches
in length or a single fracture in the hub not exceeding 3 inches
in width nor 2 inches in length will not be deemed cause for
rejection unless these defects exist in more than 5 per cent of
the entire shipment or delivery.
(_c_) Blisters or where the glazing is broken or which exceed 3
inches in diameter, or which project more than ⅛ inch above the
surface.
(_d_) Laminations which indicate extended voids in the pipe
material.
(_e_) Fire cracks or hair cracks sufficient to impair the
strength, durability or serviceability of the pipe.
(_f_) Variations of more than ⅛ inch per linear foot in alignment
of a pipe intended to be straight.
(_g_) Glaze which does not fully cover and protect all parts of
the shell and ends except those exempted in Sect. 31. Also glaze
which is not equal to best salt glaze.
(_h_) Failure to give a clear ringing sound when placed on end and
dry tapped with a light hammer.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account