Arbitrarily selected proportions are in quite general use; they are
intended to apply to the materials most commonly used in the vicinity of
the work. The most common practice is to use twice as great a volume of
coarse aggregate as fine aggregate, as for instance 1 part cement, 2
parts fine aggregate, and 4 parts coarse aggregate. Decreasing the ratio
of coarse aggregate to fine aggregate may give a more easily worked mix
or require relatively less water for a given workability, and in some
cases it will be proper to increase this ratio and thus secure an
increase of strength. Judgment and experience with given materials may
warrant changes from a stated ratio. The proportions are now frequently
given as one part cement to a certain number of parts of the mixed
aggregate, leaving the proportions of the fine to coarse to be
determined otherwise, since small variations in the relation of these
will not greatly affect the strength. Proportions in common use are:[55]
Mortar for
Laying brick and stone masonry from 1 : 0 to 1 : 3
Filling joints in sewer pipe 1 : 0 to 1 : 2
Surfaces, floors, sidewalks, pavements 1 : 0 to 1 : 2
Waterproof linings 1 : 0 to 1 : 2
Cement, bricks, and blocks 1 : 2½ to 1 : 4
Concrete for
Gravity retaining walls, heavy
foundations, structures needing mass
more than strength from 1 : 3 : 6 to 1 : 4 : 8
Retaining walls, piers, sewers,
pavements, foundations, and work
requiring strength. (Compressive
strength in 28 days, 1,500 to 2,000
pounds per square inch) from 1 : 2 : 4 to 1 : 3 : 6
Floors, beams, pavements, reinforced
concrete, arch bridges, low-pressure
tanks. (Compressive strength in 28
days, 2,000 to 3,000 pounds per
square inch) from 1 : 1½ : 3 to 1 : 2½ : 4½
Reinforced concrete columns, conduit
pipe, impervious concrete.
(Compressive strength in 28 days,
3,000 to 4,000 pounds per square
inch) from 1 : 1 : 2 to 1 : 1½ : 3
The usual method of proportioning based on minimum voids is to assume
that the particles of fine aggregate should fill the voids in the coarse
aggregate and that the particles of the cement will fill the voids in
the fine aggregate. About 5 to 10 per cent additional fine aggregate is
generally added to push the particles of the coarse aggregate apart and
thus give a more easily worked concrete and one freer from void spaces.
This method is inaccurate, principally because of the effect of the
moisture on the volume of the voids, and because the effect on the
volume by the addition of water is unknown.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account