Sidelights on Negro SoldiersWilliams, Charles H. (Charles Halston)
History
Sidelights on Negro Soldiers
Williams, Charles H. (Charles Halston)
World War, 1914-1918 -- Participation, African American
Additional equipment arrived August 2, ten days before the regiment
moved into a quiet sector in the Vosges Mountains for intensive
training around Ponseux and Archettes, and on August 20 there was
further removal to the St. Die sector previously occupied by the 7th
Engineers of the 5th Division. Just before this division left for
St. Mihiel, it conducted several local attacks down the Fave Valley
and around Frappelle, which were finally captured. When then the
317th Engineers began the work of organizing and consolidating the
positions left by the 5th Division, they found the enemy active. They
constructed dug-outs, repaired trenches, often under shell fire, and
mined bridges if these were in danger of being captured by the enemy.
They also worked at logging and sawmill operations in order to supply
French institutions as well as the fighting regiments at the front with
firewood. Especially courageous was the work of twenty-five enlisted
men engaged in gas-proofing dug-outs. They worked three days and nights
under heavy bombardment where mustard gas and phosgene were used by
the enemy, but they continued their labors until all the dug-outs were
protected.
On September 24, 1918, the regiment moved into the Argonne between Les
Islettes and Clermont, and was assigned to the First Army Corps. The
objective of the First Army was to close the Grand Pré gap and flank
the armies operating against the French and British. The bombardment
for this attack lasted three hours and it was estimated that 100,000
shells were fired. The American artillery averaged a gun every eight
meters. After the bombardment changed to a rolling barrage, the men of
the 77th, 28th, 35th, 79th, 4th, 80th, and 33rd Divisions went over
the top in the greatest attack ever made by United States forces. In
this attack one battalion of the 317th Engineers opened the road from
Neuvilly to Bourielles, cutting it through to “No Man’s Land” on the
night of September 26. The 111th Engineers assisted in this work. The
Second Battalion opened the road from Croix de Pierre and Pierre
Croisée, while the Third opened the valley road from La Claon to La
Harze. In many places these roads had been completely obliterated by
the heavy artillery fire. The engineers had to relocate them, often at
night, and rebuild them through swamps out of logs and planks in order
that the wounded might be carried to the rear and ammunition carts
reach the front. Sometimes they used rocks and timbers taken from mined
enemy trenches and burned buildings. They built light- and heavy-gauge
railroads for hauling shells to new artillery positions on the front,
and heavy-gauge railroads in the back areas, especially in the vicinity
of Grand Pré. Throughout this offensive from September 26 to November
11 the 317th Engineers spent most of the time building roads and
supplying the fighting units at the front with the necessary materials.
The men often worked day and night under shell fire, but they labored
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account