On the 10th July the sailors displayed their flags at all points, and
as many as could be spared from the floating-light and the tenders
landed to witness the long desired ceremony of laying the first stone
of the lighthouse. The importance of the building was such, that but
for the perilous and uncertain nature of any arrangement which could
have been made for this ceremony, instead of its having been performed
only in the presence of those immediately connected with the work, and
a few casual spectators from the neighbouring shore, reckoning in all
about eighty persons, many thousands would have attended upon an
occasion which must have called forth the first dignitaries of the
country in conferring upon it the highest honours of masonry.
At eleven o’clock the foundation stone was laid to hand. It was square
in form, and contained about twenty cubic feet, and had no other
inscription than the date 1808. The engineer, attended by his three
assistants, applied the square, the level, and the mallet, and
pronounced the following benediction: ‘May the Great Architect of the
universe complete and bless this building.’ Three hearty cheers were
then given, and success to future operations drunk with the greatest
enthusiasm. When the tide began to overflow the site the whole party
returned to the ship; prayers were read, and every heart, doubtless,
felt more than usually thankful.
The first continuous course was now landed on the rock and laid down.
Mr. Stevenson gives an enumeration of the various kinds and quantity
of the work in this single course. Although only one foot in thickness
it contained five hundred and eight cubic feet of granite in outward
casing; eight hundred and seventy-six cubic feet of Mylnefield stone
in the hearting; one hundred and four tons of solid contents; one
hundred and thirty-two superficial feet of hewing in the face-work;
four thousand five hundred and nineteen superficial feet of hewing in
the beds, joints, and joggles; four hundred and twenty lineal feet
boring of trenail holes; three hundred and seventy-eight feet lineal
cutting for wedges; two hundred and forty-six oaken trenails; three
hundred and seventy-eight oak-wedges in pairs.
In the work-yard about sixty men were employed in hewing and preparing
the various courses of the solid part of the building. The second
course, which contained some very weighty stones, was laid down upon
the platform in the middle of the yard, each stone being carefully
fitted and marked as it was to lie in the building.
By the end of this season the building was brought to a level with the
highest part of the margin of the foundation pit, or about five and a
half feet above the lower bed of the foundation-stone. The number of
hours work upon the rock this season at low water amounted to about
two hundred and sixty-five, of which number only eighty were employed
in building.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account