Some idea may be formed of the difficulties attending the early stages
of this work, from the fact that during the whole of the first season,
or summer of 1813, the workmen could not command more than forty-one
hours’ work upon the rock; during the second season the time was only
fifty-three hours. These two years were entirely occupied in
excavating and preparing the foundation, and in laying ten stones, or
the half course of masonry, which brought the foundation to a uniform
level for the first entire course of the building. Mr. Stevenson
contrasts this slow progress with that made at the Bell Rock during
the first two seasons. Although this building was situated twelve
miles from the shore, three courses were erected, the diameter of the
base being forty-two feet, besides the erection of a beacon-house or
barrack for the workmen. ‘The establishment for the works at the Bell
Rock was of course on a much larger scale than that of the Carr Rock;
but still the latter was equally effective, and the same apparatus,
artificers, and seamen, were employed at both.’
During the third year’s work, the second course of the masonry was
completed upon the Carr; and nine stones of the third course were laid
by the 3rd of October, when a heavy ground-swell obliged the workmen
precipitately to leave the rock and take to their boats. Before the
cement was fixed, the surge of the sea had washed it out; the oaken
trenails were wrenched off, and the whole of the nine blocks of stone
swept off the rock and lost in deep water, though they had been
completely dove-tailed and fitted on the same principles as the
masonry of the Bell-Rock lighthouse, where not a single stone was lost
during the whole progress of the work.
During the fourth season, the operations were retarded by several
untoward accidents. The wind and the waves sometimes destroyed in a
moment the labour of weeks; but by dint of skill and untiring patience
and industry, they succeeded by the month of November in completing
the sixteenth course, which raised the building to the height of about
twenty feet.
The fifth year was particularly unfortunate. The whole of the masonry
having been completed, the coast was visited in November with a gale
of wind, accompanied with a heavy swell of sea, which washed down the
upper part of the building, and reduced it to the height of the fifth
course, which formed part of the fourth year’s work. It was therefore
determined to modify the original design of the work. Instead of
completing this beacon with masonry, and providing the machine and
large bell, which was to have measured five feet across the mouth, to
be tolled by the alternate rise and fall of the tide, it was now
determined to erect six columns of cast iron upon the remaining
courses of masonry, to terminate in a cast iron ball of the diameter
of three feet, formed in ribs, elevated about twenty-five feet above
the medium level of the sea. This beacon was completed in September
1821.
FOOTNOTES:
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account