Smithsonian Institution - United States National Museum - Bulletin 240: Contributions From the Museum of History and Technology; Papers 34-44 on Science and TechnologyMuseum of History and Technology (U.S.)
History
Smithsonian Institution - United States National Museum - Bulletin 240: Contributions From the Museum of History and Technology; Papers 34-44 on Science and Technology
Museum of History and Technology (U.S.)
Science -- History; Technology -- History
With few exceptions, civil engineering is a field in which the ultimate
goal is the assemblage of materials into a useful structural form
according to a scientifically derived plan which is based on various
natural and man-imposed conditions. This is true whether the result be,
for example, a dam, a building, a bridge, or even the fixed plant of a
railroad. However, one principal branch of the field is based upon an
entirely different concept. In the engineering of tunnels the utility of
the "structure" is derived not from the bringing together of elements
but from the separation of one portion of naturally existing material
from another to permit passage through a former barrier.
In tunneling hard, firm rock, this is practically the entire compass
of the work: breaking away the rock from the mother mass, and,
coincidently, removing it from the workings. The opposite extreme in
conditions is met in the soft-ground tunnel, driven through material
incapable of supporting itself above the tunnel opening. Here, the
excavation of the tunneled substance is of relatively small concern,
eclipsed by the problem of preventing the surrounding material from
collapsing into the bore.
[Illustration: Figure 2.--HOOSAC TUNNEL. METHOD OF WORKING EARLY
SECTIONS of the project; blast holes drilled by hand jacking.
MHT model--1/2" scale. (Smithsonian photo 49260-L.)]
In one other principal respect does tunnel engineering differ widely
from its collateral branches of civil engineering. Few other physical
undertakings are approached with anything like the uncertainty
attending a tunnel work. This is even more true in mountain tunnels,
for which test borings frequently cannot be made to determine the
nature of the material and the geologic conditions which will be
encountered.
The course of tunnel work is not subject to an overall preliminary
survey; the engineer is faced with not only the inability to
anticipate general contingencies common to all engineering work, but
with the peculiar and often overwhelming unpredictability of the very
basis of his work.
Subaqueous and soft-ground work on the other hand, while still subject
to many indeterminates, is now far more predictable than during its
early history, simply because the nature of the adverse condition
prevailing eventually was understood to be quite predictable. The
steady pressures of earth and water to refill the excavated area are
today overcome with relative ease and consistency by the tunneler.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account