Steam, Its Generation and UseBabcock & Wilcox Company
History
Steam, Its Generation and Use
Babcock & Wilcox Company
Steam-boilers, Water-tube
(B) Graduated scales attached to the water glasses.
(C) Tanks and platform scales for weighing water (or water
meters calibrated in place). Wherever practicable the feed water
should be weighed, especially for guarantee tests. The most
satisfactory and reliable apparatus for this purpose consists of
one or more tanks each placed on platform scales, these being
elevated a sufficient distance above the floor to empty into a
receiving tank placed below, the latter being connected to the
feed pump. Where only one weighing tank is used the receiving
tank should be of larger size than the weighing tank, to afford
sufficient reserve supply to the pump while the upper tank is
filling. If a single weighing tank is used it should preferably
be of such capacity as to require emptying not oftener than
every 5 minutes. If two or more are used the intervals between
successive emptyings should not be less than 3 minutes.
(D) Pressure gauges, thermometers, and draft gauges.
(E) Calorimeters for determining the calorific value of fuel and
the quality of steam.
(F) Furnaces pyrometers.
(G) Gas analyzing apparatus.
5. OPERATING CONDITIONS
Determine what the operating conditions and method of firing should be
to conform to the object in view, and see that they prevail throughout
the trial, as nearly as possible.
Where uniformity in the rate of evaporation is required,
arrangement can be usually made to dispose of the steam so that
this result can be attained. In a single boiler it may be
accomplished by discharging steam through a waste pipe and
regulating the amount by means of a valve. In a battery of
boilers, in which only one is tested, the draft may be regulated
on the remaining boilers to meet the varying demands for steam,
leaving the test boiler to work under a steady rate of
evaporation.
6. DURATION
The duration of tests to determine the efficiency of a hand-fired
boiler, should be 10 hours of continuous running, or such time as may be
required to burn a total of 250 pounds of coal per square foot of grate.
In the case of a boiler using a mechanical stoker, the duration, where
practicable, should be at least 24 hours. If the stoker is of a type
that permits the quantity and condition of the fuel bed at beginning and
end of the test to be accurately estimated, the duration may be reduced
to 10 hours, or such time as may be required to burn the above noted
total of 250 pounds per square foot.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account