Steam Navigation and Its Relation to the Commerce of Canada and the United StatesCroil, James
History
Steam Navigation and Its Relation to the Commerce of Canada and the United States
Croil, James
Shipping -- Canada -- History; Shipping -- United States -- History; Steam-navigation -- History
The voyage of the Durham boat was a very tedious one, depending as it
did largely on a favouring easterly breeze in traversing the lakes and
quieter portions of the river, and on the dexterity of the boatmen who
wielded the “setting-poles”[44] in swifter water, as well as their
_luck_ in surmounting the rapids, where they were liable to be detained
for hours, sometimes for days, contending against the swift currents,
subject to the mishaps of grounding or being damaged by big boulders,
or, worse still, of being caught by an eddy or an out-current and swept
down the rapids, sometimes with the loss of the oxen or horses which
had them in tow, and in some instances with the loss of the boat and
cargo. Woe to the teamster who was not provided with a knife to cut the
rope in such an emergency!
The first Lachine Canal proper, for barges, was commenced July 17th,
1821, and was completed in 1825, at a cost of $438,404. Of this amount
$50,000 was contributed by the Imperial Government on condition that
all military stores should be free from toll. It had 7 locks, each 100
feet long, 20 feet wide, and with 4½ feet depth of water on the sills.
In 1843-49 it became a “ship canal” with 5 locks, each 200 feet long,
45 feet wide, and 9 feet depth of water, costing $2,149,128. The
recent enlargement, commenced in 1875, cost $6,500,000. By this the
locks were increased to 270 feet in length and 14 feet depth of water
throughout the canal.
THE WELLAND CANAL.
The necessity of devising means to overcome the stupendous obstacle
to navigation caused by the Falls of Niagara had long been apparent,
but it was not until 1824 that work was commenced on the Welland
Canal which was to connect Lake Ontario with Lake Erie and the west.
This important work was completed in 1829, chiefly through the energy
and perseverance of the Hon. William Hamilton Merritt, son of a U.
E. Loyalist family, born in New York State in 1793. A man of great
enterprise; he had this project on the brain for years, but like Cunard
and his steamships, had difficulty in “raising the wind”—the people
and the Government of Upper Canada being at that time both alike poor.
He crossed the Atlantic, and, on the ground of military expediency,
was said to have secured a subscription of £1,000 from the Duke of
Wellington, which greatly aided him in the formation of a joint stock
company who carried the work to its successful completion. The original
locks were constructed of wood, 120 feet in length, 20 feet wide, with
7½ feet of water on the sills. The entire length of the canal was
twenty-six miles. This accommodated vessels carrying 5,000 bushels
of wheat. Half a million of pounds were spent upon it up to the year
1841, when it was assumed by the United Canadas[45] and immediate steps
taken for its enlargement. With locks 145 x 26 x 9, vessels loaded
with 20,000 to 23,000 bushels could pass from lake to lake. A second
enlargement (1873-83) increased the depth of water to twelve feet; and
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account