that these prophecies did not originate with them.
The engines for the screw propeller by James Watt and Co. were
horizontal and direct-acting, and were of 1800 nominal horse-power and
4886 horse-power indicated. They weighed 500 tons. Six double-ended
tubular rectangular boilers gave steam at 25 lb. pressure. The
propeller was a four-bladed cast-iron screw 36 tons in weight, and of
24 feet diameter and 44 feet pitch. The shaft of the propeller weighed
60 tons and was 150 feet in length. So as not to interfere with her
speed when the screw should not be working, two small auxiliary engines
were fitted to keep it revolving when disconnected from the main
engines. Her speed under the screw alone was about nine knots.
Her longitudinal bulkheads were carried to the uppermost deck, which
was perfectly flush and extended from one end of the ship to the other.
An iron deck connected the head of each longitudinal bulkhead with the
ship’s sides and this, being at the greatest possible distance from
the bottom of the girder, was in a position to contribute most to the
longitudinal strength. The Britannia Bridge over the Menai Straits
has its top and bottom flanges of cellular construction, and Brunel
practically repeated this formation in the _Great Eastern_, by making
both the bottom and the upper deck cellular.
The launch of the _Great Eastern_ was arranged for November 3, 1857,
and it was not till then that it became known that this was to be the
vessel’s name and not _Leviathan_. The vessel moved only a few feet and
then stuck. One of the causes of the hitch was that the ship was being
launched sideways, thereby greatly adding to the difficulties of the
operation. Another attempt a few days later did not move her an inch.
On January 11 she was got a little nearer the water and the next day
was moved a little farther; she was finally launched at the next spring
tides at the end of the month.
[Illustration: MODEL OF THE PADDLE-ENGINES OF THE “GREAT EASTERN.”]
“It is incomprehensible how so eminent an engineer as Brunel should
have made such a mistake as to attempt to force so huge a fabric
broadside-on into the river. The costly experiment added £120,000 to
the cost of the ship, and practically ruined the company.”[89]
[89] Kennedy’s “History of Steam Navigation.”
As the company had not the money to finish her, it was wound up and the
ship was sold to another company, formed to take her over, the price
being £160,000. It was necessary to raise another £300,000, and as the
financiers would not find the money, the public was appealed to and
responded to the extent of £50,000 from some of the humblest classes in
the community, “without any expectation of profit, but solely that they
might hear of the great ship, which they looked upon as the pride of
England, being fairly afloat on the deep waters.”[90]
[90] _Illustrated London News_, August 13, 1859.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account