Steam-ships : $b The story of their development to the present dayFletcher, R. A.
History
Steam-ships : $b The story of their development to the present day
Fletcher, R. A.
Shipbuilding; Steamboats
Two oil-tankers, the _Paul Paix_ and _Gascony_, have been built by
Messrs. Craggs and Sons on this system. One of them grounded off Calais
with a cargo of oil or benzine on board, and on being dry-docked for
examination was found to have no damage to her plates whatever. All the
steamers built on the Isherwood plan have a marked absence of vibration
even when running light.
The corrugated steam-ship _Monitoria_, launched in the summer of 1909
by Messrs. Osbourne Graham and Co., Sunderland, to the order of the
Ericsson Shipping Company of Newcastle-on-Tyne, is another departure
from accepted ideas. She is an ordinary “tramp” steamer so far as
dimensions and engine-power go; her only difference, and it is an
important one, is that she has two corrugations running along each
side between bilge and load water-line, and extending from the turn of
the bow to the turn of the quarter. These corrugations do not project
very greatly, but according to the inventor, they so affect the stream
and wave action around and under the vessel that a source of wasted
energy is prevented, and more power becomes available for propulsion.
The _Monitoria’s_ dimensions are: length, 288 feet 6 inches over all;
breadth, 39 feet 10¹⁄₂ inches; the breadth over the corrugations
is nearly 42 feet. The space for bulk cargoes is greater than on
her sister ships by the cubic contents of the corrugations, but the
tonnages remain unaltered. As a sea-going ship it was found that the
corrugations made her much steadier, acting as though they were bilge
keels, and that the coal consumption was less, notwithstanding that
she made faster time than her sister vessels under precisely similar
conditions.
[Illustration: THE “MONITORIA”: TRANSVERSE SECTION.]
The third innovation is the application of the belt-conveyor principle
to a collier. The steamer _Pallion_, in which the machinery is
installed, is equipped throughout with twin belt conveyors which,
travelling fore and aft the vessel in a space under the cargo, carry
the cargo towards the stern, whence it is carried on other belts at
the front of the poop for delivery. The latter belts are carried on
swivel booms which can be raised or lowered or moved sideways, so that
the cargo is delivered direct by the belts into railway trucks on the
quay or into barges, and the operation can be conducted at the rate of
250 tons an hour on each side of the vessel simultaneously. Under this
system no shoots are used, and there is no handling of the coal. The
_Pallion_ requires only about six hours to discharge a full cargo with
six men, as against over a hundred men and eleven hours in the ordinary
way. Her water-ballast tanks can be emptied or filled as fast as the
cargo is placed in her or taken out. She was built by the Doxford firm
at Sunderland for a Newcastle Shipping Company.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account