The Argentine Republic: Its Development and ProgressDenis, Pierre
History
The Argentine Republic: Its Development and Progress
Denis, Pierre
Agriculture -- Argentina; Argentina -- Description and travel; Argentina -- Economic conditions -- 1918-
[111] According to the details given us by De Angelis (1837,
Introduction to the _Diario del viaje al Rio Bermejo de Fray
Francisco Moritto_, Coll. de Angelis, vol. vi) a convoy of
fourteen wagons from Salta to Tucuman required three relays of
oxen. The first, comprising a hundred animals, went from Salta
to Tucuman; the second, of 130 animals, went from Tucuman to
the Buenos Aires frontier; the third (84 animals), went on to
the capital. The first and last relays were hired animals, the
second alone being the property of the _tropero_.
The stages were rarely more than four or five leagues of five
kilometres each (thirteen to sixteen miles). At this rate it took a
convoy forty to fifty days to go from Buenos Aires to Mendoza, thirty
days from Rosario to Tucuman, three months (with the necessary rests)
from Buenos Aires to Salta.[112] When water ran short, the journey
might be greatly prolonged, as the animals could do less work, or not
work at all if the _aiguades_ had dried up. The season was a matter for
consideration. In the Buenos Aires district the winter made the ground
sodden and traffic difficult. Farther north, winter is the dry season,
so that pasture was scarce, and it was difficult to feed the _tropas_.
The summer had difficulties of its own. In January and February the
floods of the Rio Dulce often made it impossible to cross the ford at
Santiago. The carriers preferred to start from the northern provinces
about the end of the summer, in April or May. The best season for
leaving Buenos Aires was the spring, from August to November. In this
way each _tropa_ could make the double journey once a year.
[112] Thirty days from Buenos Aires to Mendoza, and seventy
days from Buenos Aires to Jujuy, says Barrero (F. Barrero,
_Descripcion de las Provincias del Rio de la Plata_, end of
the eighteenth century, published by the Ministry of Foreign
Affairs, Buenos Aires, 1911).
There had been attempts to speed up the transport before the railways
were made. The _galera_ (diligence), with its swarm of horses harnessed
with the _cincha_ (saddle to which the lasso was attached), did
not carry goods. It did not replace the convoy of wagons, but the
_tropilla_ of spare horses which travellers on the plain drove before
them. The _galera_ went from Rosario to Cordoba in three days and to
Mendoza in ten days, and from Cordoba to Salta in fourteen days. About
1860 a quicker goods service was organized, light wagons drawn by mules
replacing the ox-wagons. They made the journey from Rosario to Cordoba
in six days. Similarly, on the Pampa, the ox-wagons had been replaced
before 1889 by quicker wagons, drawn by horses, to convey wool from the
ranches to the railway stations.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account