The Bark Canoes and Skin Boats of North AmericaChapelle, Howard Irving
History
The Bark Canoes and Skin Boats of North America
Chapelle, Howard Irving
Canoes and canoeing -- North America; Indians of North America -- Boats; Skin boats -- North America
After the chines and floor are fitted to the keelson, the frames at
the thwarts are made and set up at the desired flare and height, being
held in place by temporary spreaders lashed or braced. These are
sometimes stiffened by thongs from frame head to keelson at each pair,
to steady the frame while the gunwale is being bent. As the lengths of
the thwarts are controlled by the fairing of the gunwales, the thwarts
are not fitted until after the latter are in place. As shown in the
figure above, the gunwales are round poles, slightly flattened on the
lower side at the headboards, where they are secured by lashings. In
building, the gunwales are shaped and secured by lashing them to those
side frames selected to shape the hull. The lashings that secure the
side frames to both gunwale and chine are passed through holes in each
member and are hove taut by means of a short lever with a hole bored
in it to take the end of the lashing, which is also wrapped around the
lever to give temporary purchase. The side frames have saddle notches
to bear on the chine and gunwale. All lashings in the frame, it will be
noted, pass through holes bored in the members and in some cases the
lashings are let in, so that the sinew is flush with the surfaces of
the members, to prevent the lashing from being damaged by chafing.
[Illustration: Figure 168
UMIAKS NEAR CAPE PRINCE OF WALES, ALASKA, showing walrus-hide cover
and lacing. Frame lashings are walrus-hide thongs. (_Photo by Henry B.
Collins._)]
With the gunwales faired, the remaining frames are then put in position
and lashed to the gunwales and chines. An outside batten is run along
each side and lashed by turns of sinew over the batten and around the
side frames, with the lashings let into each member to prevent slipping
and chafing. The batten is lashed at bow and stern in some umiaks, but
in many it is stopped just short of coming home on the posts. Next, the
short frames at bow and stern are put in place and the risers secured
inside the side frames, then, with the thwarts fitted and lashed to
the risers, and the ends of the gunwales are lashed together at bow
and stern, the boat is ready to be covered. When ready to cover, the
frame is stiffened by diagonal thong ties, each of which has one end
secured by turns around the gunwale, with the other end passed through
holes in the keelson and secured. These are commonly found in western
umiaks; the small umiak has but one pair placed amidships. The timber
used in such craft is fir, spruce, and willow, and is usually driftwood
obtained at river-mouth.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account