The Bark Canoes and Skin Boats of North AmericaChapelle, Howard Irving
History
The Bark Canoes and Skin Boats of North America
Chapelle, Howard Irving
Canoes and canoeing -- North America; Indians of North America -- Boats; Skin boats -- North America
The roll of birch bark is now removed from storage, perhaps in a nearby
pool where it has been placed to keep it flexible, and unrolled white
side up on the building bed. As the bark dries, it will become more and
more stiff, so it will be necessary to moisten it frequently during
construction to maintain its flexibility.
The bark is usually long enough, but often it is not wide enough. If
the bark is too short, it may be pieced out at this time, or later. If
it is not wide enough it is centered on the bed; the piecing out will
be done later. The gunwale frame is now laid on the bark, care being
taken to place it as nearly as possible in its former position on the
bed.
The bark outside the frame is then slashed from the edge to a point
close to the end of each thwart, and also to points along the frame
halfway between the thwarts, so that the edges can be turned up. While
it is being slashed, the bark cover is bent slightly, so that it is
cut under tension. Later, when the required shape can be determined,
these slashes will be made into gores, the Malecite canoes having
flush seams, not overlaps, in the topsides and bottom. If a fault is
noted along the outer edge of the bark, a slash may be placed so as to
allow the fault to be cut out in the later goring; irregularity in the
position of the cuts does no great harm to the progress of building
these canoes. The slashes are usually carried to within an inch of the
gunwales on the bed. It is not customary to slash the bark close to the
end, there the bark can usually be brought up unbroken, depending upon
the form of the end.
When the bark has been cut as described, it can be turned up smoothly
all around the frame so that the stake holes can be seen and a few
of the stakes can be replaced. The frame and the bark are then
realigned so that all stakes may be replaced in their holes without
difficulty. When the frame and bark are aligned, the frame is weighted
as before and the bark is turned up all around it, the stakes being
firmly driven, as this is done, in their original holes. The longest
stakes are at the ends of the frame, as the depth of the hull is to be
greatest there. The tops of each pair of opposite stakes are now tied
together with a thong of basswood or cedar bark, to hold them rigid and
upright.
[Illustration: Figure 35
MALECITE CANOE BUILDERS NEAR FREDERICTON, N.B., using wooden plank
building bed with stakes set in holes in the platform. This was a late
method of construction, which probably originated in the early French
canoe factory at Trois Rivières, Que.]
After the bark is turned up around the frame, its lack of width becomes
fully apparent. At this stage, some builders fitted the additional
pieces to gain the necessary width; others did it later. The method of
piecing the bark cover and the sewing technique, however, is explained
here.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account